Corruption Risk Analysis at the Project Planning Stage in the Iraqi Construction Sector using the Bowtie Methodology
...Show More Authors

In this paper, the bowtie method was utilized by a multidisciplinary team in the Federal Board of Supreme Audit (FBSA)for the purpose of managing corruption risks threatening the Iraqi construction sector. Corruption in Iraq is a widespread phenomenon that threatens to degrade society and halt the wheel of economic development, so it must be reduced through appropriate strategies. A total of eleven corruption risks have been identified by the involved parties in corruption and were analyzed by using probability and impact matrix and their priority has been ranked. Bowtie analysis was conducted on four factors with high score risk in causing corruption in the planning stage. The number and effectiveness of the existing proactive measures to prevent threats from resulting in corruption and were examined for each threat.

Scopus Clarivate Crossref
View Publication
Publication Date
Wed Aug 31 2022
Journal Name
Mathematical Modelling Of Engineering Problems
Evaluation of Al-Ishaqi Irrigation Project: A Case Study Eastern Canal of the Project
...Show More Authors

An evaluation the performance of the irrigation system for the Al-Ishaqi irrigation project for the Eastern Canal was conducted to identify management strategies that can be used to improve the operation and performance of the irrigation system. The study area is located in Salah al-Din G.0overnorate, Iraq. The field work included determining the moisture content of the soil before and after irrigation, measuring the inflow of the field to find the depth of the applied water, field monitoring, and measuring the depth of the root zone for each irrigation process. Field measurements showed that the average efficiency of water application for the two fields (A, and B) are 59.81% and 38.6%, respectively. The results of the efficiency of

... Show More
View Publication
Scopus (3)
Crossref (1)
Scopus Crossref
Publication Date
Mon Feb 01 2021
Journal Name
Meta Gene
Association analysis of FTO gene polymorphisms rs9939609 and obesity risk among the adults: A systematic review and meta-analysis
...Show More Authors

View Publication
Scopus (18)
Scopus
Publication Date
Tue Dec 01 2020
Journal Name
Gulf Economist
The Bayesian Estimation in Competing Risks Analysis for Discrete Survival Data under Dynamic Methodology with Application to Dialysis Patients in Basra/ Iraq
...Show More Authors

Survival analysis is one of the types of data analysis that describes the time period until the occurrence of an event of interest such as death or other events of importance in determining what will happen to the phenomenon studied. There may be more than one endpoint for the event, in which case it is called Competing risks. The purpose of this research is to apply the dynamic approach in the analysis of discrete survival time in order to estimate the effect of covariates over time, as well as modeling the nonlinear relationship between the covariates and the discrete hazard function through the use of the multinomial logistic model and the multivariate Cox model. For the purpose of conducting the estimation process for both the discrete

... Show More
View Publication Preview PDF
Publication Date
Mon Apr 01 2013
Journal Name
Ibn Al-haitham Journal For Pure And Applied Science
The Construction of (k, 3)-Arcs in PG (2, 9) by Using Geometrical Method
...Show More Authors

In this work, we construct projectively distinct (k,3)-arcs in the projective plane PG(2,9) by applying a geometrical method. The cubic curves have been been constructed by using the general equation of the cubic. We found that there are complete (13,3)-arcs, complete (15,3)-arcs and we found that the only (16,3)-arcs lead to maximum completeness

Publication Date
Sat Jun 01 2019
Journal Name
Telematics And Informatics
Corrigendum to “Modelling the utilization of cloud health information systems in the Iraqi public healthcare sector” [Telematics and Informatics, 36 (2019) 132–146]
...Show More Authors

View Publication
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Thu Jul 07 2022
Journal Name
Public Works Management & Policy
Impact of Pandemic SARS COVID-19 on Different Construction Project Management: Problems and Solutions
...Show More Authors

This study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a

... Show More
Scopus (8)
Crossref (10)
Scopus Clarivate Crossref
Publication Date
Thu Jul 07 2022
Journal Name
Public Works Management & Policy
Impact of Pandemic SARS COVID-19 on Different Construction Project Management: Problems and Solutions
...Show More Authors

This study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a

... Show More
View Publication
Scopus (8)
Crossref (10)
Scopus Clarivate Crossref
Publication Date
Sat Dec 02 2023
Journal Name
Journal Of Engineering
Empirical Study for Capturing and Allocating Significant Risk Factors in School Construction Projects in Iraq
...Show More Authors

In Iraq, more than 1031 school projects have been halted due to disputes and claims resulting from financial, contractual, or other issues. This research aims to identify, prioritize, and allocate the most critical risk factors that threaten these projects’ success for the duration (2017-2022). Based on a multi-step methodology developed through systematic literature reviews, realistic case studies, and semi-structured interviews, 47 risk factors were identified. Based on 153 verified responses, the survey reveals that the top-ranked risk factors are corruption and bribery, delaying the payments of the financial dues to the contractors or sub-contractors, absence of risk management strategy, multiple change orders due

... Show More
View Publication Preview PDF
Scopus (7)
Crossref (3)
Scopus Crossref
Publication Date
Thu Jul 31 2025
Journal Name
Lecture Notes In Networks And Systems
Integration Between Network Analysis and Business Process Reengineering and Their Role in Reduce Project Costs/Applied Research in the Oil Projects Company
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Fri Dec 22 2006
Journal Name
Journal Of Planner And Development
Evaluating the matrix method to achieve the objectives in the budget between planning alternatives
...Show More Authors

The aim of this research does not deal with evaluation occurs at any points in the design of the plan alternatives themselves or formulation of goals and objectives. The aim of this research is that test and evaluate the fully alternatives. We can therefore state as the principle that evaluation of alternative plans must be based on attempts to show how far each plan satisfies all the objectives are expressed as specification of the performance of the urban and regional system. The planner can submit the result (as in the traditional way) for each alternative, with particular reference to the weighting of objectives. The summery result can be presented and the preferred plan indicated that with largest index of Goals-achievement.