Corruption Risk Analysis at the Project Planning Stage in the Iraqi Construction Sector using the Bowtie Methodology
...Show More Authors

In this paper, the bowtie method was utilized by a multidisciplinary team in the Federal Board of Supreme Audit (FBSA)for the purpose of managing corruption risks threatening the Iraqi construction sector. Corruption in Iraq is a widespread phenomenon that threatens to degrade society and halt the wheel of economic development, so it must be reduced through appropriate strategies. A total of eleven corruption risks have been identified by the involved parties in corruption and were analyzed by using probability and impact matrix and their priority has been ranked. Bowtie analysis was conducted on four factors with high score risk in causing corruption in the planning stage. The number and effectiveness of the existing proactive measures to prevent threats from resulting in corruption and were examined for each threat.

Scopus Clarivate Crossref
View Publication
Publication Date
Sat Jan 01 2022
Journal Name
International Journal Of Mechanical Engineering
Innovations and Requirements of Strategy for Digital Maintenance Management in Construction Project
...Show More Authors

Scopus (2)
Scopus
Publication Date
Sun Jan 01 2023
Journal Name
Organization, Technology And Management In Construction: An International Journal
Using the ordinal priority approach for selecting the contractor in construction projects
...Show More Authors
Abstract<p>Effective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formul</p> ... Show More
View Publication
Scopus (2)
Crossref (2)
Scopus Clarivate Crossref
Publication Date
Sat Feb 12 2022
Journal Name
Engineering, Technology &amp; Applied Science Research
Investigating the Causes of Poor Cost Control in Iraqi Construction Projects
...Show More Authors

Controlling cost in construction projects is an essential issue. This study investigates the most critical problems that cause weakness in cost control in Iraqi construction projects. The quantitative technique was used by conducting a survey directed to professionals who work on construction projects. One hundred and sixty-four questionnaire forms were distributed to private sector companies, government companies, and government institutions, and the responses were subjected to the required statistical analysis. The results indicate that the most influential factors are the weakness in keeping up with the use of modern concepts, methods, and technologies, the delay in receiving the amounts due for work done from the owner, fluctuat

... Show More
View Publication
Crossref (10)
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
International Journal Of Management And Enterprise Development
Studying the decision-making state and impact in Iraqi construction projects
...Show More Authors

View Publication
Scopus (2)
Crossref (1)
Scopus Crossref
Publication Date
Sat Jan 01 2022
Journal Name
International Journal Of Management And Enterprise Development
Studying The Decision-Making State and Impact in Iraqi Construction Projects
...Show More Authors

View Publication
Crossref
Publication Date
Mon Jan 01 2024
Journal Name
Journal Of Engineering
Significant Safety Factors Affecting the Safety Performance in Iraqi Construction Projects
...Show More Authors

Despite recent attempts to improve safety in the construction sector, this sector is considered dangerous and unsafe. Iraq is one of the emerging nations that suffers from a lack of construction safety management. In 2018, the construction sector in Iraq was responsible for 38% of all industrial accidents. Creating a safety program minimizes this problem by making safety an intrinsic part of construction projects. As a result, this article aims to identify the crucial safety factors that affect the safety performance in Iraqi construction projects. After conducting a critical literature review of the related literature, a list of 35 sub-factors classified into nine categories of main factors was chosen to rank each facto

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Mar 01 2010
Journal Name
Journal Of Economics And Administrative Sciences
Planning the main production tables using the correct binary programming method
...Show More Authors

This research include building mathematical models for aggregating planning and shorting planning by using integer programming technique for planning master production scheduling in order to control on the operating production for manufacturing companies to achieve their objectives of increasing the efficiency of utilizing resources and reduce storage and  improving customers service  through  deliver in the actual dates and reducing delays.

View Publication Preview PDF
Crossref
Publication Date
Sun Feb 03 2019
Journal Name
Journal Of The College Of Education For Women
Originations for Teaching Physics at Secondary Stage main of the Educational Aims
...Show More Authors

Origination for Teaching Physics at Secondary Stage main of the Educational Aims

View Publication Preview PDF
Publication Date
Sun Jan 01 2023
Journal Name
Journal Of Engineering
Evaluation of the Current Status of the Cost Control Processes in Iraqi Construction Projects
...Show More Authors

One of the most important problems of Iraqi construction projects is the cost variances, so it is important to identify the problems and shortcomings that cause poor cost control. Through the utilization of questionnaires, the study evaluated how project costs were managed and reported. The questionnaire was distributed to 180 professionals working in the Iraqi construction sector, with a response rate of 91%. The results showed that a high percentage of projects are implemented with a difference between real and estimated costs, and the process of documenting cost data needs to be more secure. On the other hand, there is a weakness in providing the necessary work structure information to monitor costs and a lack of proc

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Thu Sep 01 2011
Journal Name
Journal Of Economics And Administrative Sciences
Auto Risk Analysis in Iraq
...Show More Authors

يتنامى يوما بعد يوم استخدام السيارات وتتعاضم اعدادها ، فهذا هو عصر السرعة، وخاصة في مجال النقل والمواصلات، والتي تتحقق باستخدام وسائل النقل المختلفة ومن بينها السيارات، وبالتالي اصبحت هذه الوسيلة ضرورية لتحقيق هذه السرعة ومن ضرورات الحياة في انجاز الاعمال.

وتتبارى مصانع السيارات فيما بينها لانتاج انواع السيارات بمواصفات عالية من المتانة والامان والراحة، وفي ذات الوقت اصبحت هندسة الطرق

... Show More
View Publication Preview PDF
Crossref