Objective: To assess prospectively functional outcome of interlocked intramedullary nailing fixation in management of closed tibia shaft fractures. Methodology: This prospective study included 134 patients with closed shaft tibia fractures with age 18-60 years and isolated closed fracture of shaft of tibia. The fractures were fixed by interlocking intramedullary nail. At follow-up after 12 months postoperatively, the functional outcome was assessed radiographically for the sign of union and clinically according to Klemm-Borner criteria. Results: The mean age was 38.55 years. Out of 134 patients, 55.2% were male. The cause was road traffic accident in 44.8%, majority of the fracture occur in the mid-shaft (41.8%), and oblique fracture was the commonest type which accounted for 35.1%. The anterior knee pain was the commonest complications after surgery (11.9%). More than 90% patient achieved normal o or less than 5 angulation. The functional outcome was excellent in 67.9%, good in 29.9% and only 2.2% had fair results. Conclusion: Interlocking intramedullary nailing is a good choice in the treatment of most closed shaft tibia fractures. (Rawal Med J 202;46:890-893)
Mouth ulcers are common oral lesions. Although several topical treatments are commercially available, their limited residence time requires frequent application, which remains a significant drawback. This study aimed to develop a novel mucoadhesive, thermosensitive, in situ gel-forming spray for local delivery of betamethasone sodium phosphate, thereby reducing systemic exposure. Formulations were optimized using the design of experiment approach to investigate the effects of thermosensitive polymers (Poloxamer 407 and Poloxamer 188), mucoadhesive polymer (hyaluronic acid), and drug incorporation on gelation temperature and time. The optimized formulation gelled at 33.3 ± 0.7 °C within 14.79 ± 1.87 s and showed a spray angle of 4
... Show MoreIn this study, the energy charging mechanism is mathematically modeled to determine the impact of design modifications on the thermofluidic behavior of a phase change material (PCM) filled in a triplex tube containment geometry. The surface area of the middle tube, where the PCM is placed, is supported by single or multi-internal frustum tubes in vertical triplex tubes to increase the performance of the heating and cooling of the system. In addition to the ordinary straight triplex tubes, three more scenarios are considered: (1) changing the middle tube to the frustum tube, (2) changing the inner tube to the frustum tube, and (3) changing both the internal and central tubes to the frustum tubes. The impact of adopting the tube desig
... Show MoreDelays and disruption are a common issue in both community and personal building programs The problem exists all throughout the world, but it is particularly prevalent in Iraq, where millions of dollars are squandered each time as a outcome. Delays and interruptions may have serious consequences not just for Iraq's construction plans, but also for the country's economic and social status. While numerous studies have been conducted to investigate the factors driving delays and disruption in Iraqi construction projects, slight consideration has been given to by what means project management implements and approaches have affected the occurrence of project delays and disruption. After analyzing the crucial reasons for delays and instability in
... Show MoreBackground: Trauma to the anterior teeth is a common injury in young children. Themaxillary incisors being the most affected. Although root fractures are rare, theydo occur and were previously and often considered hopeless and were extracted.The time between the injury and the initiation of treatment, level of the fractureline, and stage of root development are some criteria to be considered whenchoosing a treatment approach for a complicated tooth fracture. This case reportdescribes the management of a traumatized immature maxillary central incisorwith Elise class IV fracture with vertical oblique subgingival fracture of the root.Materials and method: Apexification was carried out using biodentine followed byremoval of the fracture
... Show MoreObjective: study aims to identify the diabetes type2 clients self management skills toward dietary pattern
, and find out the relationship between variables which are (Age, gender, educational level, duration of DM
diagnosis, and monthly income) with diabetes type 2 clients self management skills toward dietary pattern
Methodology: descriptive study was carried out through the present investigation from January 2nd
2011to September 2nd 2011 in order to achieve the objectives of the present study. A non probability
(purposive) sample, (200) cases which consists of clients who were attending Al-Nasiriyha diabetic center.
Including (118) males and (82) females. The data were collected by utilization of the study instrument
Introduction: Methadone hydrochloride (MDN) is an effective pharmacological substitution treatment for opioids dependence, adopted in different countries as methadone maintenance treatment (MMT) programmes. However, MDN can exacerbate the addiction problem if it is abused and injected intravenously, and the frequent visits to the MMT centres can reduce patient compliance. The overall aim of this study is to develop a novel extended-release capsule of MDN using the sol-gel silica (SGS) technique that has the potential to counteract medication-tampering techniques and associated health risks and reduce the frequent visits to MMT centres. Methods: For MDN recrystallisation, a closed container method (CCM) and hot-stage method (HSM) were conduc
... Show MoreThe purpose of this study is aimed to lay down an arranged platform suited to Iraqi constructional associations which in charge to carry out multi constructional projects, as it fulfilled management requirements and supervising, so that low - cost projects will be controlled in due term and quality. Based on primary info and observed data collected, the study thesis has been formulated in this way: Iraqi constructional sector bodies which are in charge to implement simultaneously multi constructional projects in need to reformulate its organized structure so that it will be more fitted to management and control of these projects. This thesis includes a
theoretical part contained presenting the most important resources locally and int