A 3D geological model is an essential step to reveal reservoir heterogeneity and reservoir properties distribution. In the present study, a three-dimensional geological model for the Mishrif reservoir was built based on data obtained from seven wells and core data. The methodology includes building a 3D grid and populating it with petrophysical properties such as (facies, porosity, water saturation, and net to gross ratio). The structural model was built based on a base contour map obtained from 2D seismic interpretation along with well tops from seven wells. A simple grid method was used to build the structural framework with 234x278x91 grid cells in the X, Y, and Z directions, respectively, with lengths equal to 150 meters. The total number of grids is (5919732) in the geological model. CPI (computer-processed interpretation) for 7 wells contain (facies, porosity, water saturation, and NTG) was imported to Petrel 2016 software. Facies log was upscaled and distributed along the 3D grid. Truncated Gaussian with trend method was used to distribute the facies taking into account the conceptual facies model of the Mishrif formation. The result shows that the trend of sedimentation suggests a retrogradation pattern from NW to SE. Facies1 (Reservoir), dominated by Limestone brown to light brown, with oil shows has good distribution within the area and thinning towards the NW. The petrophysical properties (porosity, water saturation, NTG, and permeability) were distributed using the Sequential Gaussian Simulation (SIS) method and the facies model as a guide for distribution. The results show that petrophysical properties enhanced in the southeast area, representing the reef region compared to the northwest side of the study area. Unit Mishrif B had the highest porosity value and lower water saturation value along the entire field. While the units Mishrif B1, B2, and B3 show a gradual decrease in reservoir properties towards the field's southeast side. The results also show that the conceptual facies model has great benefit in constructing the 3D geological model, reflecting the geological knowledge used to correctly distribute the reservoir properties (porosity and water saturation).
The water injection of the most important technologies to increase oil production from petroleum reservoirs. In this research, we developed a model for oil tank using the software RUBIS for reservoir simulation. This model was used to make comparison in the production of oil and the reservoir pressure for two case studies where the water was not injected in the first case study but adding new vertical wells while, later, it was injected in the second case study. It represents the results of this work that if the water is not injected, the reservoir model that has been upgraded can produce only 2.9% of the original oil in the tank. This case study also represents a drop in reservoir pressure, which was not enough to support oil production
... Show MoreThis research aim to exploring the positive psychological capital concept (PsyCap) which drawn from positive psychology and applying it at workplace. PsyCap emerged as extending for recent another types of capital, such as human capital and social capital. It has been defined as “an individual’s positive psychological state of development". The PsyCap consist of four core constructs (self- efficacy, optimism, hope, and resilience). Each of the four components has considerable theorizing and researching that can contribute to developing an integrative theoretical foundation for PsyCap. But their combined motivational effects will be broader and more impactful than any one of t
... Show MoreABSTRACT In dam construction stages when an earth embankment has retained a reservoir with constant water surface elevation for a long time, seepage conditions within the embankment will be reach a steady state. If it is necessary to drain the reservoir quickly, the pore-water pressures in the embankment may remain relatively high while the stabling effect of the reservoir's weight along the upstream (U/S) side for the embankment has removed. This process is referring to as "Rapid Drawdown" and may be cause instability in the upstream (U/S) face of the embankment. Kongele dam is one of the proposed earth dams to be implement within the current plan in Iraq. The authors study pore water pressure and the effect of rapid drawdown for the dam d
... Show MoreIn this paper, a relationship between the liquid limit and the coefficient of consolidation of Iraqi soils are studied. The samples of soil used in study are undisturbed silty clay. These samples are taken from different locations and depths of Middle and South of Iraq by cooperation with Consulting Engineering Bureau- University of Baghdad- College of Engineering. The depth reached about 20 meters. The experimental work is made to calculate the liquid limit and the coefficient of consolidation. From these sites, 280 points are obtained. The relationship between the liquid limit and the coefficient of consolidation is drawn as a curve. This curve is studied and compared with the curve that obtained from other studies. From these curves, it
... Show MoreThis study aims to predict the organic pollution produced from the presence of some polycyclic aromatic hydrocarbons (PAHs) and determination it's concentrations (µg/L , ppb) in Tigris river water by a collection twenty-seven water samples from a selected three stations with nine sampling sites and three depths of water (5 cm , 2 m and 4 m) each site for 4.6 km distance of a geographic studied area which is located between the ( Al-Senak and AL-Sarrafiah bridges ) at Baghdad city – Iraq on May, 2012. The geographic location was determined with a Global Positioning System (GPS) and Geographic Information System (GIS) software program. The concentrations of fourteen components (PAHs) were performed using the reverse phase
... Show MoreA theoretical investigation is carried out to study the effect of a pencil electron beam propagating inside the plasma region determining the hydrodynamic densities distribution with the aid of numerical analysis finite deference method (FDM).The plasma is generated and trapped by annular electron beams of fixed electron density 1x1014 m-3. The result of the study shows that the hydrodynamic density behaves as the increase in pencil electron beam. The hydrodynamic density ratio goes to more than double as the increase in pencil electron beam density to 1x1018 m-3.
Planning of electrical distribution networks is considered of highest priority at the present time in Iraq, due to the huge increase in electrical demand and expansions imposed on distribution networks as a result of the great and rapid urban development.
Distribution system planning simulates and studies the behavior of electrical distribution networks under different operating conditions. The study provide understanding of the existing system and to prepare a short term development plan or a long term plan used to guide system expansion and future investments needed for improved network performance.
The objective of this research is the planning of Al_Bayaa 11 kV distribution network in Baghdad city bas
... Show MoreLittoral and benthic invertebrates from Roundwood Reservoir System were sampled. Oligochaetes and molluscs were the dominant organisms in the littoral and benthic areas Trichopterans and chironomids were the most abundant insect groups. Scuba diving samples reinforced that view. Other groups of macroinvertebrates were poorly represented. Vertical and horizontal hauls of zooplankton revealed that there were twelve species of zooplankton present. Daphnia hyalina Leydig and Bosmina coregoni Baird were the two dominant species.
Reservoir study has been developed in order to get a full interesting of the Nahr Umr formation in Ratawi oil field. Oil in place has been calculated for Nahr Umr which was 2981.37 MM BBL. Several runs have been performed to get matching between measured and calculated of oil production data and well test pressure. In order to get the optimum performance of Nahr Umr many strategies have been proposed in this study where vertical and horizontal wells were involved in addition to different production rates. The reservoir was first assumed to be developed with vertical wells only using production rate of (80000–125000) STB/day. The reservoir is also proposed to produce using horizontal wells besides vertical wells with pr
... Show More