Gas lift is one of the most important artificial lift methods for increasing oil production, as wells often require this method after the reservoir's energy has decreased. In this research, an optimal gas lift system is designed for five horizontal wells in the Ahdab oil field, which suffers from low production. At the same time, water cut in some of these wells reaches 66%, while the productivity index is low in others, which makes the challenges clear, and a deep analysis is needed to find an optimal system. The Pipesim program is used to design the optimal gas lift system, which contains features that facilitate the implementation of the appropriate design and provide the ability to analyze and determine the optimal design values, as well as to detect future production problems. A single system is designed for wells located in the same formation, where an injection pressure of 1750 psi, an injection rate of 1 mmscf/d, and a wellhead pressure of 300 psi are chosen for wells in the Mishrif formation, noting that three valves will be installed in the system. For the wells in the Rumaila formation, an injection pressure of 1950 psi, an injection rate of 1.25 mmscf/d, a wellhead pressure of 475 psi, and four valves were selected for the unloading process. The results proved the design efficiency and that the selected values were optimal, as the increase in production for the five wells was 238%, 146%, 56.6%, 55.9%, and 37.4%.
Drilling with casing (DWC) can be considered as a modern drilling technique in which both of drilling and casing operations done in the same time by using the casing to transfer the hydraulic and mechanical power to the bit instead of traditional drilling string. To overcome oil well control, minimizing the total cost through enhancing drilling efficiency, drilling with casing was proposed as an enabling technology.
Two surface sections (17 1/2 - and 12 1/4- inch) were drilled successfully in Rumaila oil field with casing strings which reached 655m and 1524m measured depths respectively.
By using DWC technique, the total drill/case phase time was reduced up to 20% comparing to conventional
... Show MoreAn experiment was conducted to study the effect of the sprayer type according to the source of power and the size of the spray nozzle concerning the quality of the spray produced and fuel consumption.Two types of sprayers were used: a conventional boom sprayer (S1) and a modified (electrified) boom sprayer (S2), along with three sizes of the XR TeeJet 110 spray nozzle (N). The following technical performance indicators were examined: Density of coverage (drops/cm2) using ImageJ software, a 600dpi business card scanner, specifically the ScanShell 800N by CSSN, Inc, and water-sensitive paper (WSP), rate of spray nozzles discharge (ml/min), and fuel consumption (liters/hectare) using a c
This study was conducted according to contract with the North Refineries Company-Baiji and deals with the hydrodesulphurization of vacuum gas oil of Kirkuk crude oil, boiling range 611-833 K. A trickle bed reactor packed with a commercial cobalt-molybdenum on alumina catalyst was used. The operating conditions were: temperature range 583-643 K, liquid hourly space velocity range 1.50-3.75 1/h, hydrogen to oil ratio about 250 l/l and pressure kept constant at 3.5MPa.
The results showed that the aromatic content decreased and sulfur removal increased with increasing temperature and decreasing space velocity. The properties (viscosity, density, flash point and carbon residue) of the products decrease with temperature increasing, but the
Petrophysical characterization is the most important stage in reservoir management. The main purpose of this study is to evaluate reservoir properties and lithological identification of Nahr Umar Formation in Nasiriya oil field. The available well logs are (sonic, density, neutron, gamma-ray, SP, and resistivity logs). The petrophysical parameters such as the volume of clay, porosity, permeability, water saturation, were computed and interpreted using IP4.4 software. The lithology prediction of Nahr Umar formation was carried out by sonic -density cross plot technique. Nahr Umar Formation was divided into five units based on well logs interpretation and petrophysical Analysis: Nu-1 to Nu-5. The formation lithology is mainly
... Show MorePurpose: the purpose of this study is to investigate how managers working for the General Authority for Irrigation and Reclamation Projects react to the impact of Emotional Intelligence (EI) on their performance. Theoretical framework: The current study includes an intellectual framework on two variables, namely EI and Manager Performance (MP), because it is essential to investigate the relationship between these two variables and the impact of EI on MP. Design/methodology/approach: The research problem is that a manager's capacity to make wise decisions about their work or interactions with subordinates is diminished when they have inadequate EI. The questionnaire is used as a tool for gathering data for the study, and the st
... Show MoreCurrent research aims to analyze the relationship and impact of the explanatory variable transcendental leadership, which includes dimensions (values and attitudes, behavior, spirituality, vision and hope/faith) in the responsive variable university performance dimensions (relationships and resources available, human capital development, scientific research, community service). Field research for the leaders of a number of colleges of the University of Baghdad of the deans of the colleges of research and assistants of deans and heads of departments, the main research problem was the important question (what is the role of transcendent leadership in promotin
... Show MoreThis paper deals with a Twin Rotor Aerodynamic System (TRAS). It is a Multi-Input Multi-Output (MIMO) system with high crosscoupling between its two channels. It proposes a hybrid design procedure that combines frequency response and root locus approaches. The proposed controller is designated as PID-Lead Compensator (PIDLC); the PID controller was designed in previous work using frequency response design specifications, while the lead compensator is proposed in this paper and is designed using the root locus method. A general explicit formula for angle computations in any of the four quadrants is also given. The lead compensator is designed by shifting the dominant closed-loop poles slightly to the left in the s-plane. This has the effect
... Show MoreThis paper deals with a Twin Rotor Aerodynamic System (TRAS). It is a Multi-Input Multi-Output (MIMO) system with high crosscoupling between its two channels. It proposes a hybrid design procedure that combines frequency response and root locus approaches. The proposed controller is designated as PID-Lead Compensator (PIDLC); the PID controller was designed in previous work using frequency response design specifications, while the lead compensator is proposed in this paper and is designed using the root locus method. A general explicit formula for angle computations in any of the four quadrants is also given. The lead compensator is designed by shifting the dominant closed-loop poles slightly to the left in the
... Show MoreThere is a variety of artificial foot designs variable for use with prosthetic legs . Most of the design can be divided into two classes, articulated and non-articulated feet. one common non-articulated foot is the SACH . The solid ankle cushion heel foot referred to as the SACH foot has a rigid keel .
One key or the key factor in designing a new prosthesis is in the analysis of a patients response .
This view is the most important because if the foot does not provide functional , practical or cosmetically acceptable characteristics the patient will not feel comfortable with the prosthesis , therefore design and manufacturing a new foot is essential, this foot made from polyethylene, its different shape and characte
... Show MoreOne of the principle inputs to project economics and all business decisions is a realistic production forecast and a practical and achievable development plan (i.e. waterflood). Particularly this becomes challenging in supergiant oil fields with medium to low lateral connectivity. The main objectives of the Production Forecast and feasibility study for water injection are:
1- Provide an overview of the total expected production profile, expected wells potential/spare capacity, water breakthrough timing and water cut development over time
2- Highlight the requirements to maintain performance, suggest the optimum developmen