Preferred Language
Articles
/
4hgmqZUBVTCNdQwCm30I
The Construction of Al-Sultaniyyah City and Its Most Important Urban Manifestations During the Ilkhanid Mongol Period (651-756 AH/ 1253-1355 AD)
...Show More Authors

The Ilkhanid Mongols (651-756 AH / 1253-1355 AD) were interested in urbanization and construction in keeping with civilized countries and to have an architectural imprint that competed with the neighboring nations. The Ilkhan Öljeitü Muḥammad Khudābandeh (703-716 AH / 1303-1316 AD), known for his love of building and construction, wanted to have a capital that would immortalize his name and history, so he ordered its construction to compete with contemporary cities, and he summoned workers and engineers from all over the world to contribute to its construction. The city has several educational and service institutions such as schools, ribats, khanqas, mosques, hospitals, markets, and baths, as well as a mausoleum for him, which became one of the most beautiful urban landmarks during his reign. Among the ministers in building several institutions in the city, were Ali Shah Tabrizi (d. 724 AH / 1323 AD), and Faḍl Allah Rashid Al-Din al-Hamadhani (d. 717 AH / 1317 AD).

Scopus Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun Feb 10 2019
Journal Name
Journal Of The College Of Education For Women
Social Medical Care for the Deformed Children: A Field Study in Baghdad City
...Show More Authors

The Child is the first sedum for the human society performing, and we deal in our
research to explain the nature of the mutual relations in between the form and the medicine
social caring foundation. So the motherhood and the childhood nowadays become the most
dedicated in the researchers works, whom interesting in the social affairs, and that whom
work in the medicine field as scientists.
So the child is the future man and must be in wright body construction that need to great
care and interest to make him wright mind through capability of performing anything support
to him.
In our research we deal with the main factors in which lead to infect the child by the
creative malfunction, like the environmental and m

... Show More
View Publication Preview PDF
Publication Date
Wed Jan 01 2025
Journal Name
World Neurosurgery
The Ventriculoperitoneal Shunt Complication Rate in Baghdad Medical City from 2019 to 2022
...Show More Authors

View Publication
Scopus (1)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Thu Jan 10 2019
Journal Name
International Journal Of Research In Social Sciences And Humanities
PHYSICAL AND FUNCTIONAL CONSTRUCTION INDICATORS AND THEIR RELATIONSHIP TO SOME ELEMENTS OF FITNESS FOR BUDDING BASKETBALL PLAYERS
...Show More Authors

Basketball is a popular game in many parts of the world and many developed countries are making continuous efforts to prepare and develop their emerging players on scientific and clear bases as the basis for reaching high levels The researchers used the descriptive approach in the method of correlative studies to suit the nature of the study The readymade software (IBM SPSS Statistics Version24) was used to perform statistical treatments The researchers concluded that there was a significant relationship between body size indicators (height and weight) with the fitness elements of the emerging basketball players The researchers recommended conducting a similar study to determine the type of relationship to the indicators of the physical str

... Show More
Publication Date
Mon Jun 01 2015
Journal Name
Conference: 8th International Conference And Exhibition On Design And Production Of Machines And Dies/molds
Design, Construction, and Controlling of A Shaped Metal Deposition Machine Using Arc Metal-Wire System
...Show More Authors

Publication Date
Tue Jan 01 2013
Journal Name
Ibn Al-haitham Journal For Pure And Applied Science
Classification and Construction of (k,3)-Arcs on Projective Plane Over Galois Field GF(7)
...Show More Authors

The purpose of this work is to study the classification and construction of (k,3)-arcs in the projective plane PG(2,7). We found that there are two (5,3)-arcs, four (6,3)-arcs, six (7,3)arcs, six (8,3)-arcs, seven (9,3)-arcs, six (10,3)-arcs and six (11,3)-arcs. All of these arcs are incomplete. The number of distinct (12,3)-arcs are six, two of them are complete. There are four distinct (13,3)-arcs, two of them are complete and one (14,3)-arc which is incomplete. There exists one complete (15,3)-arc.

Publication Date
Wed Jun 01 2016
Journal Name
Journal Of Engineering
Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq
...Show More Authors

Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public a

... Show More
View Publication Preview PDF
Publication Date
Sun Jan 01 2012
Journal Name
Conference
Identifying Causes of Variation in Construction Industry Based on Questionnaire
...Show More Authors

Publication Date
Thu Aug 21 2025
Journal Name
Journal Of Engineering
Construction of a General-Purpose Infrastructure for Rfid – Based Applications
...Show More Authors

View Publication
Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
Development of an Integrated Construction Management System for Building Estimation
...Show More Authors

Project management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Oct 02 2023
Journal Name
Journal Of Engineering
Main Delay Factors of Implementation EPC Construction Projects in Iraq
...Show More Authors

This essay aims to highlight the most important issues and difficulties facing implementing large projects that follow the turn-key method, considered one of the types of contractual methods in Iraq, especially for large and complex projects requiring speedy completion. The projects implemented in this way face delays and delays in completion, which led to the lack of benefit from the projects for which they were implemented, especially those affecting the lives of citizens within the health sector. The case study dealt with the construction of hospitals with multi-bed capacities within multiple governorates in Iraq, With large financial allocations within the federal budget of the Government of Iraq over several years.

... Show More
View Publication Preview PDF