Preferred Language
Articles
/
4Ba2CYcBVTCNdQwCETAv
Safety management in private construction project in Iraq
...Show More Authors

Scopus Crossref
View Publication
Publication Date
Tue Jul 12 2022
Journal Name
Proceedings Of Seventh International Congress On Information And Communication Technology
Identification of Key Criteria of Selecting the Delivery System and Type of Contract in Construction Projects
...Show More Authors

View Publication
Scopus (1)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Fri Jun 30 2023
Journal Name
Journal Of The College Of Education For Women
The Request Construction in the Diwan of (Al-Shamakh bin Dirar Al-Dhubyani) A Rhetorical Study
...Show More Authors

This study examined the imperative construction: the command, the interrogative, the prohibition, the call, and the wish. In the Diwan of Al-Shamakh bin Dirar; where the poetic verses were monitored in each of the topics of the student's creation, and the rhetorical meanings that he came out with. What is new in this study is that it is the first to study the demanded composition in the poetry of a glorious poet, Al-Shammakh bin Dirar Al-Dhubyani. As his poetry did not receive such a study, it sought to employ what was written by rhetoric scholars, in an attempt to explore the demanded composition in the poetry of Al-Shamakh. The study adopted the descriptive analytical approach, which is based on counting the number of times the poet us

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Feb 28 2019
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Evaluation of the Construction, Build, Operate and Transfer (B.O.T): Applied Research in Southern Cement State Company
...Show More Authors

   Form of investment in infrastructure important factor to drive economic growth in any country, with the dwindling ability of governments to provide the necessary funds for such investments, emerged as a rising trend for private sector involvement in public projects and infrastructure, and one of these trends is the build-operate-transfer system (BOT), which commonly used in various developed and developing countries as one of the tools used in the implementation of these investments, as the private sector under this system design, finance, build and operate the project, and are re-administration of the state after a certain period under a contractual agreement between the parties of the contract. As this system provides majo

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Feb 01 2021
Journal Name
Journal Of Engineering
Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate
...Show More Authors

Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w

... Show More
View Publication Preview PDF
Crossref (6)
Crossref
Publication Date
Sat Jun 01 2019
Journal Name
Journal Of Economics And Administrative Sciences
Intermediate Role Of information Technology In The Relationship To The Entrepreneurial Orientation and Success Factors Of The Project (Analytical exploratory research in Al – Zawraa General Company)
...Show More Authors

The purpose of the current research is to identify the reality and applicability of the entrepreneurial approach in its dimensions (creative, proactive, independent, risk tolerant, offensive) and its impact on the success factors of the project (organizational commitment, communication, project team, project monitoring) Access to information, treatment, storage), which is a significant and important link in the success and development of industrial projects with the possibility of studying and analyzing the provision of the appropriate environment for this.

 the research started from a problem expressed by a number of intellectual and practical questions aimed at answering them as well as To answer a

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Using Water Quality Index to Assess Drinking Water For AL-Muthana Project
...Show More Authors

The water quality index is the most common mathematical way of monitoring water characteristics due to the reasons for the water parameters to identify the type of water and the validity of its use, whether for drinking, agricultural, or industrial purposes. The water arithmetic indicator method was used to evaluate the drinking water of the Al-Muthana project, where the design capacity was (40000) m3/day, and it consists of traditional units used to treat raw water. Based on the water parameters (Turb, TDS, TH, SO4, NO2, NO3, Cl, Mg, and Ca), the evaluation results were that the quality of drinking water is within the second category of the requirements of the WHO (86.658%) and the first category of the standard has not been met du

... Show More
Crossref (3)
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Using Water Quality Index to Assess Drinking Water For AL-Muthana Project
...Show More Authors

The water quality index is the most common mathematical way of monitoring water characteristics due to the reasons for the water parameters to identify the type of water and the validity of its use, whether for drinking, agricultural, or industrial purposes. The water arithmetic indicator method was used to evaluate the drinking water of the Al-Muthana project, where the design capacity was (40000) m3/day, and it consists of traditional units used to treat raw water. Based on the water parameters (Turb, TDS, TH, SO4, NO2, NO3, Cl, Mg, and Ca), the evaluation results were that the quality of drinking water is within the second category of the requirements of the WHO (86.658%) and the first category of the standard has not

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Sat Aug 01 2020
Journal Name
Iop Conference Series: Materials Science And Engineering
Achieving the Benefits and Requirements of Integrated Project Delivery Method Using BIM
...Show More Authors
Abstract<p>Through the last decade, Integrated Project Delivery (IPD) methodology considers one of the new contractual relations that are also on the way to further integrate the process of combining design and instruction. On the other hand, Building Information Modeling (BIM) made significant advancements in coordinating the planning and construction processes. It is being used more often in conjunction with traditional delivery methods. In this paper, the researcher will present the achievement of IPD methodology by using BIM through applying on the design of the financial commission building in Mayssan Oil Company in Iraq. The building has not been constructed yet and it was designed by usin</p> ... Show More
View Publication
Scopus (3)
Crossref (4)
Scopus Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
A spherical fuzzy AHP model for contractor assessment during project life cycle
...Show More Authors
Abstract<p>Measurement of construction performance is essential to a clear image of the present situation. This monitoring by the management team is necessary to identify locations where performance is exceptionally excellent or poor and to identify the primary reasons so that the lessons gained may be exported to the firm and its progress strengthened. This research attempts to construct an integrated mathematical model utilizing one of the recent methodologies for dealing with the fuzzy representation of experts’ knowledge and judgment considering hesitancy called spherical fuzzy analytic hierarchy process (SFAHP) method to assess the contractor’s performance per the project performance pa</p> ... Show More
View Publication
Scopus (5)
Crossref (5)
Scopus Clarivate Crossref
Publication Date
Tue Sep 01 2020
Journal Name
Journal Of Engineering
Development of Bridges Maintenance Management System based on Geographic Information System Techniques (Case study: Al-Muthanna \ Iraq)
...Show More Authors

A Geographic Information System (GIS) is a computerized database management system for accumulating, storage, retrieval, analysis, and display spatial data. In general, GIS contains two broad categories of information, geo-referenced spatial data and attribute data. Geo-referenced spatial data define objects that have an orientation and relationship in two or three-dimensional space, while attribute data is qualitative data that can be counted for recording and analysis. The main aim of this research is to reveal the role of GIS technology in the enhancement of bridge maintenance management system components such as the output results, and make it more interpretable through dynamic colour coding and more sophisticated visualization

... Show More
View Publication
Crossref (5)
Crossref