The Causes Influencing the Occurrence of Variation Orders in the Construction of Buildings
...Show More Authors

In the construction of buildings usually, problems occur because of the causes of change orders. The main causer of change orders is the owners, consultants, and contractors. These changes lead to conflicts among them which result in influencing building projects. Therefore, it is necessary to analyze the causes of change orders to reduce them and facilitate management. This paper determines the most critical factors that cause change orders from a different point of view, a consulting owner and a contractor, and a study of the reality of the management of change orders when constructing public buildings. The method employed in this research is a field survey using interviews with experts working in the construction of p

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Tue Mar 01 2016
Journal Name
Al-academy
Employing the elements of film construction in embodying the style cinematically: عامر الحديثي
...Show More Authors

The researcher concluded that it consists of several types of structures, where the intellectual structure related to the choice of the idea, its treatment, its effect, the choice of the topic, the way ideas are addressed and presented in the film, and then the dramatic structure of the film's characters, the formulation of its events, its dramatic composition, its temporal arrangement, the identification of the parties to the conflict and their management, then these are formulated. Visions and ideas through the visual and audio signal systems, which work to highlight the stylistic features in the character of the film director.

View Publication Preview PDF
Crossref
Publication Date
Sat Jun 26 2021
Journal Name
Asian Journal Of Civil Engineering
Using AHP to prioritize the corruption risk practices in the Iraqi construction sector
...Show More Authors

View Publication
Scopus (7)
Crossref (6)
Scopus Crossref
Publication Date
Tue Aug 20 2019
Journal Name
Political Sciences Journal
Towards completion of state construction : stations in legitimacy of contemporary Iraqi political system
...Show More Authors

The power of the state in Iraq has been influenced by legitimacy, which may have resembled the belt of transmission, affecting the rule of law and social cohesion. The emergence of the political system may have come about as a result of balancing the competing forces within society today as a basis for collective action. The country's march in Iraq was not a result of a series of gradual transitions such as the established ones. For almost a century, there was an extraordinary succession of succession. At each of the three stages of the state there was an internal or external change. They change or disintegrate and others appear. Social and economic conditions may change or the society is exposed to external invasion or our ideas are imp

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Mar 31 2024
Journal Name
Association Of Arab Universities Journal Of Engineering Sciences
Using Solid Waste as A Substitute for Raw Materials in Construction: A Review.
...Show More Authors

The main challenge is to protect the environment from future deterioration due to pollution and the lack of natural resources. Therefore, one of the most important things to pay attention to and get rid of its negative impact is solid waste. Solid waste is a double-edged sword according to the way it is dealt with, as neglecting it causes a serious environmental risk from water, air and soil pollution, while dealing with it in the right way makes it an important resource in preserving the environment. Accordingly, the proper management of solid waste and its reuse or recycling is the most important factor. Therefore, attention has been drawn to the use of solid waste in different ways, and the most common way is to use it as an alternative

... Show More
View Publication
Publication Date
Wed Dec 01 2021
Journal Name
Civil And Environmental Engineering
Prediction of the Delay in the Portfolio Construction Using Naïve Bayesian Classification Algorithms
...Show More Authors
Abstract<p>Projects suspensions are between the most insistent tasks confronted by the construction field accredited to the sector’s difficulty and its essential delay risk foundations’ interdependence. Machine learning provides a perfect group of techniques, which can attack those complex systems. The study aimed to recognize and progress a wellorganized predictive data tool to examine and learn from delay sources depend on preceding data of construction projects by using decision trees and naïve Bayesian classification algorithms. An intensive review of available data has been conducted to explore the real reasons and causes of construction project delays. The results show that the postpo</p> ... Show More
Scopus (9)
Crossref (9)
Scopus Clarivate Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tend

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Fri Feb 01 2019
Journal Name
Journal Of Economics And Administrative Sciences
The role of strategic Agility in organizational excellence In Ministry of Construction, Housing, Municipalities and Public Works
...Show More Authors

The aim of this research is to identify the role of strategic agility achieving organizational excellence in one of the formations of the Ministry of Municipalities (Dhi Qar Sewage Directorate), as important service organizations that have a key role in serving and developing the society which faced many administrative challenges and issues and as a result of the changes in the environment is continuing and accelerating, so the adoption of modern administrative concepts such as strategic Agility and knowledge of their role in achieving organizational excellence can help them in facing these changes and achieve what they aspire to. In order to achieve research objectives, two main hypotheses have been formulated. The first hypothe

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Oct 01 2015
Journal Name
Journal Of Economics And Administrative Sciences
The Impact of Strategic Intelligence In Decision Making Styles An Analytical research in the Construction& Housing ministry
...Show More Authors

            This research aims to explore the impact of strategic  intelligence by his dimensions (Foresight , system thinking, vision, motivation and partnership) on decision making styles which represented by ( rational, intuitive, dependent, Spontaneous and  Avoidant style) for a sample of the administrative leaders in the center of  Reconstruction &Housing Ministry and Some its formations which are companies of (Sa'ad, Al Mansour, al Farouq, Assyria, al-Mu'tasim, al- Rasheed, and Public Authority for Housing).  So to achieve the  research objectives and to test hypotheses, it has been relying

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of

... Show More