Preferred Language
Articles
/
4Ba2CYcBVTCNdQwCETAv
Safety management in private construction project in Iraq
...Show More Authors

Scopus Crossref
View Publication
Publication Date
Thu Mar 01 2018
Journal Name
Journal Of Engineering
Risks of Design Stage in Iraqi Construction Project
...Show More Authors

The management of construction projects needs to complete the basics of system management and work. Starting from the idea and how to turn it into a full study and ended at the construction project completion arriving at the purpose prepared for it, so the projects need to control on its operation and integration system in order to succeed.

It is no secret for who concerned in construction projects field that the design stage is a very important stage in construction project because it determines the final features of the project through the requirements provided by the employer for the consultant to formulate it during this phase in the form of plans, drawings, and specifications, then translated on the ground as the shape of co

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Thu Jul 07 2022
Journal Name
Public Works Management & Policy
Impact of Pandemic SARS COVID-19 on Different Construction Project Management: Problems and Solutions
...Show More Authors

This study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a

... Show More
View Publication
Scopus (4)
Crossref (4)
Scopus Clarivate Crossref
Publication Date
Thu Jul 07 2022
Journal Name
Public Works Management & Policy
Impact of Pandemic SARS COVID-19 on Different Construction Project Management: Problems and Solutions
...Show More Authors

This study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a

... Show More
Scopus (4)
Crossref (4)
Scopus Clarivate Crossref
Publication Date
Fri Apr 01 2016
Journal Name
Journal Of Engineering
A Program Applying Professional Safety Basics in Construction Projects
...Show More Authors

When industrial and  constructional renaissance started in the world, the great interest was going on towards the equipment’s,  which was the first mean for production. After industry was settled the interest was going on towards the men ship which manpower on which the production depends. It was approved that it represents the basic part in all of the processes and the protection of those individuals against dangers of these equipment’s, industry and its accidents was the basic things which was studied in many researches until it crystallized in general principles for all industries and other take care in each industry.

     The professional safety is concerned as restrict which

... Show More
View Publication Preview PDF
Publication Date
Sat Jul 01 2023
Journal Name
Journal Of Engineering
Develop Proactive System for Risk Management (DPSRM) for Lagging Investment Project in Iraq.
...Show More Authors

To finalize any construction investment project, it would be necessary to identify the most significant problems and obstacles that lead to project reluctance and stalling. Unexpected events and conflicts may have disrupted these strategies and impacted project development. Due to the high initial investment costs of construction projects, crises can have an immediate impact, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which prompted the researcher to identify and evaluate those obstacles through this research and questionnaires using Pareto scientific theory to exclude factors that do not contribute to project lag. It was discovered that 28 o

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Apr 08 2018
Journal Name
Al-khwarizmi Engineering Journal
Building a Management System to Control the Construction Claims in Iraq
...Show More Authors

The paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Fri Jul 01 2016
Journal Name
Journal Of Engineering
Identificatio n Of Key Factors Affecting Waste Management In Life Cycle Of The Construction Project By Using Delphi Technique
...Show More Authors

The problem of generated waste as a result of the implementation of construction projects, has  been aggravated recently because of construction activity experienced by the world, especially Iraq, which is going through a period of reconstruction, where construction waste represents (20-40%) of the total generated waste and has a negative effect on the environment and economic side of the project. In addition, the rate of consumpted  amounts of natural resources are estimated to be about 40% in the construction industry, so it became necessary to reduce waste and to be manage well. This study aims to identify the key factors affecting waste management through the various phases of the project, and this is accom

... Show More
View Publication Preview PDF
Publication Date
Tue Dec 01 2015
Journal Name
Journal Of Engineering
Valuation the Impact of Risks on the Goals and the Safety of Construction Projects in Iraq
...Show More Authors

Construction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.

The research aims first to the effective planning for analysis and risk managemen

... Show More
View Publication Preview PDF
Publication Date
Mon Oct 30 2023
Journal Name
Iraqi Journal Of Science
3D Resistivity Imaging Investigation for Engineering Construction Project Studies at Al-Muthana Airport in Baghdad, Iraq
...Show More Authors

     Engineering project assessment at Al-Muthana Airport in Baghdad, Iraq, has been studied using a 3D electrical resistivity imaging survey. The site investigation is crucial for assessing the future of the region's infrastructures since it reveals the location of buried facilities or weak zones below the surface and measures localized groundwater levels. Wenner-Schlumberger array was used to conduct four parallel 2D electrical resistivity spreads (MU1 to MU4). Each spread line was 100 m in length with 1 m electrode spacing and an average spacing of 9 meters between any two adjacent lines. The depth of the investigation was around 23.8 m. Survey lines were drawn going from northwest to southeast. These spreads were combined to prov

... Show More
View Publication Preview PDF
Scopus Crossref
Publication Date
Tue May 24 2022
Journal Name
International Journal Of Occupational Safety And Ergonomics
Contributions of safety critical success factors and safety program elements to overall project success
...Show More Authors

View Publication
Scopus (17)
Crossref (14)
Scopus Clarivate Crossref