Preferred Language
Articles
/
4Ba2CYcBVTCNdQwCETAv
Safety management in private construction project in Iraq
...Show More Authors

Scopus Crossref
View Publication
Publication Date
Tue Dec 22 2020
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Cost Management of construction industries according to the fast-track method
...Show More Authors

Construction projects have become a changing dramatically in recent decades and that the goal of the beneficiaries of the implementation of structural project is to complete the work with less time and within the cost of the specific and the best possible quality may sometimes happen that highlights the importance of time on the rest of the items at the implementation of projects for various reasons, including the need to use the project as soon as possible possible change rapidly to customer's requests, but the high cost of the project represents the biggest obstacle for entrepreneurs with its effects on the quality and the time workers, and is a measure of those elements in monetary terms is the key to integration between them, so the

... Show More
View Publication Preview PDF
Publication Date
Tue Aug 01 2017
Journal Name
Journal Of Economics And Administrative Sciences
Relationship of the key elements of Knowledge management with strategic performance / filed research sample of private banks in Baghdad
...Show More Authors

objective  the research to diagnosis and interpretation of the nature of the correlation between the  basic elements of knowledge management (tecgnology , structure , culture , process , human resource ) and the strategic performance of the Iraqi private banks, the research community and the level dimensions, and  tested this research in the private banking sector represented by (7), especially in Baghdad city, Iraqi banks, and applied on sample consisting of 100 distributors in several administrative levels Director (Director, Director of the department, branch manager), and use questionnaire Head to collect data and information tool, and some private banks annual reports, has sought research to test a number of h

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Journal Of Engineering
Factors Affecting Labor Productivity on Construction in Kurdistan of Iraq: Web Survey
...Show More Authors

This study was set out to investigate factors affecting labor productivity on construction in the north of Iraq (Kurdistan) and to rank all the factors based on engineers, contractors, and designer’s opinions. 76 factors were analyzed based on previous literature and a pilot study. Next, by using online Google Form, a questionnaire form was created and sent to people who have experience in the construction industry. Afterward, the questionnaire form was sent to targeted people by email and social media apps. Factors were divided into nine groups “Management, Technical and Technology, Human and Workforce, Leadership, Motivation, Safety, Time, Material and Equipment, and External”. However, 202 respondents participated in this study,

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Sat Sep 30 2017
Journal Name
Pharmacy Practice
Physician-pharmacist agreement about off-label use of medications in private clinical settings in Baghdad, Iraq
...Show More Authors

View Publication
Scopus (3)
Crossref (2)
Scopus Crossref
Publication Date
Sun Jan 01 2023
Journal Name
8th Engineering And 2nd International Conference For College Of Engineering – University Of Baghdad: Coec8-2021 Proceedings
Impact of project delivery method on geotechnical site conditions for implementing water treatment plants in Iraq
...Show More Authors

View Publication
Scopus (1)
Scopus Crossref
Publication Date
Fri Jun 24 2022
Journal Name
Iraqi Journal Of Science
Computation of Climatic Water Balance for Greater Musaiyab Project Site in Babylon Governorate- Central of Iraq
...Show More Authors

The meteorological data recorded in Al-Hilla station for the period (1984-2014) were used to describe the climatic condition of the Greater Musaiyab Project lies in Babylon Governorate, 90Km southern of Baghdad City, central of Iraq. This study found that the summation of rainfall is (112.323 mm), average of relative humidity (47.44%), temperature (25.55 C◦), sunshine (8.748 h/day) and the total of evaporation is (2268.463 mm). In this research, three classifications were applied to find the type of climate in the study area. The results of the climate classification show that, the climate of study area is characterized by dry and relatively hot in summer, and cold with low rain in winter. Thornthwiat equation was used to determine the

... Show More
View Publication Preview PDF
Publication Date
Tue Aug 01 2023
Journal Name
Journal Of Engineering
The Role of Project Health Check Reports in Identifying Indicative Factors of a Troubled Project
...Show More Authors

Government-sponsored projects in Iraq significantly improve the economic situation and provide services but face high rates of troubling blocks. This work aims to identify indicative factors of the Troubled Project using periodic health check reports based on a literature review and interviews with Iraqi experts. As a result, a questionnaire was prepared that included four sections. The first is personal information; the second section is information about knowing the level of institutions’ implementation of project management through prepared documents. The third section is about indicative factors for the project's trouble, including 25 workers; the fourth section is about the questions in the periodic reports to che

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun May 02 2021
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The effect of applying lean construction tools to improving the results of the earned value management model: Applied research in Al-Rasheed General Company for Construction Contracting
...Show More Authors

Contracting companies play a prominent role today in economic activity, due to their contribution to the implementation of major construction projects which together constitute the infrastructure of society. Most construction projects also suffer from exceeding the time and cost specified and planned for the completion of the project, and this comes for several reasons, including the work environment, country conditions, The method of managing project costs and the techniques used in its implementation Accordingly, the concepts of lean construction came, which help in addressing the causes of waste, both in time and cost, in addition to the fact that project management needs techniques that are useful in controlling the control and manag

... Show More
View Publication Preview PDF
Publication Date
Mon Jun 19 2023
Journal Name
Journal Of Engineering
A Proposed Management System for Construction Practices during Sustainable Buildings Life Cycle
...Show More Authors

For many years, the construction industry damages have been overlooked such as unreasonable consumption of resources in addition to producing a lot of construction waste but with global awareness growth towards the sustainable development issues, the sustainable construction practices have been adopted, taking into account the environment and human safety. The research aims to propose a management system for construction practices which could be adopted during constructing different types of sustainable buildings besides formulating flowcharts which clarify the required whole phases of sustainable buildings life cycle. The research includes two parts: theoretical part which generally ,handles the sustainability concepts at construction i

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Development a Proposed System of Organization Structure to Management Multi Construction Projects
...Show More Authors

The purpose of this study is aimed to lay down an arranged platform suited to Iraqi constructional associations which in charge to carry out multi constructional projects, as it fulfilled management requirements and supervising, so that low - cost projects will be controlled in due term and quality. Based on primary info and observed data collected, the study thesis has been formulated in this way: Iraqi constructional sector bodies which are in charge to implement simultaneously multi constructional projects in need to reformulate its organized structure so that it will be more fitted to management and control of these projects. This thesis includes a
theoretical part contained presenting the most important resources locally and int

... Show More
View Publication Preview PDF
Crossref