Preferred Language
Articles
/
3xddBpMBVTCNdQwCJsSi
Text File Hiding Randomly Using Secret Sharing Scheme
...Show More Authors

Exchange of information through the channels of communication can be unsafe. Communication media are not safe to send sensitive information so it is necessary to provide the protection of information from disclosure to unauthorized persons. This research presented the method to information security is done through information hiding into the cover image using a least significant bit (LSB) technique, where a text file is encrypted using a secret sharing scheme. Then, generating positions to hiding information in a random manner of cover image, which is difficult to predict hiding in the image-by-image analysis or statistical analyzes. Where it provides two levels of information security through encryption of a text file using the secret sharing and the generating random positions of hiding. This method has been in hiding a text file and recovered without loss of information, as well as not noticing any deformation of the image. Where it was hiding a text file size of 20 KB in image cover (250x250) pixels, the result of MSE is 0.696 and PSNR is 49.211.

Crossref
View Publication
Publication Date
Wed Oct 06 2021
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
Image segmentation by using thresholding technique in two stages
...Show More Authors

View Publication
Scopus (2)
Scopus Crossref
Publication Date
Sat Sep 02 2017
Journal Name
Journal Of Engineering
Estimation Curve Numbers using GIS and Hec-GeoHMS Model
...Show More Authors

Recently, the development and application of the hydrological models based on Geographical Information System (GIS) has increased around the world. One of the most important applications of GIS is mapping the Curve Number (CN) of a catchment. In this research, three softwares, such as an ArcView GIS 9.3 with ArcInfo, Arc Hydro Tool and Geospatial Hydrologic Modeling Extension (Hec-GeoHMS) model for ArcView GIS 9.3, were used to calculate CN of (19210 ha) Salt Creek watershed (SC) which is located in Osage County, Oklahoma, USA. Multi layers were combined and examined using the Environmental Systems Research Institute (ESRI) ArcMap 2009. These layers are soil layer (Soil Survey Geographic SSURGO), 30 m x 30 m resolution of Digital Elevati

... Show More
View Publication Preview PDF
Publication Date
Sun Dec 03 2017
Journal Name
Ibn Al-haitham Journal For Pure And Applied Science
Studying Hueckel edge detector using binary step edge image
...Show More Authors

Publication Date
Thu Dec 01 2022
Journal Name
Iraqi Journal Of Science
PLAGIARISM DETECTION SYSTEM IN SCIENTIFIC PUBLICATION USING LSTM NETWORKS
...Show More Authors

Scopus (2)
Scopus
Publication Date
Sat Oct 01 2016
Journal Name
2016 2nd International Conference On Science In Information Technology (icsitech)
Cloud computing sensitive data protection using multi layered approach
...Show More Authors

View Publication
Scopus (3)
Scopus Crossref
Publication Date
Mon Sep 19 2016
Journal Name
Spie Proceedings
Simulation of push-pull inverter using wide bandgap devices
...Show More Authors

View Publication
Scopus Clarivate Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
Reducing settlement of soft clay using different grouting materials
...Show More Authors
Abstract<p>Different injection material types were tried in the injection of soft clay, such as lime (L), silica fume (SF), and leycobond-h (LH). In this study, experiments were made to study the effect of injection on soft clay consolidation settlement. A sample of natural soft clayey soil was investigated in the laboratory and the sample was injected with each of the grout materials used, L, SF, L + SF, and L + SF + LH. A 20 cm<sup>3</sup> of each slurry grout was conducted into the soil, which was compacted in California Bearing Ratio (CBR) mold and cured for 7 days, and then the sample was loaded to 80 N load by a circular steel footing 60 mm in diameter. The settlement was r</p> ... Show More
View Publication
Scopus (7)
Crossref (6)
Scopus Clarivate Crossref
Publication Date
Fri Jun 23 2023
Journal Name
Al-mustansiriyah Journal Of Science
Image Encryption Using New Non-Linear Stream Cipher Cryptosystem
...Show More Authors

In this paper, we designed a new efficient stream cipher cryptosystem that depend on a chaotic map to encrypt (decrypt) different types of digital images. The designed encryption system passed all basic efficiency criteria (like Randomness, MSE, PSNR, Histogram Analysis, and Key Space) that were applied to the key extracted from the random generator as well as to the digital images after completing the encryption process.

Publication Date
Fri Mar 01 2019
Journal Name
Al-khwarizmi Engineering Journal
Comparison Study of Electromyography Using Wavelet and Neural Network
...Show More Authors

In this paper we present a method to analyze five types with fifteen wavelet families for eighteen different EMG signals. A comparison study is also given to show performance of various families after modifying the results with back propagation Neural Network. This is actually will help the researchers with the first step of EMG analysis. Huge sets of results (more than 100 sets) are proposed and then classified to be discussed and reach the final.

View Publication Preview PDF
Publication Date
Wed Apr 05 2023
Journal Name
Journal Of Engineering
Construction Time-Cost Optimization Modeling Using Ant Colony Optimization
...Show More Authors

In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc

... Show More
View Publication Preview PDF
Crossref (1)
Crossref