The covid-19 global pandemic has influenced the day-to-day lives of people across the world. One consequence of this has been significant distortion to the subjective speed at which people feel like time is passing. To date, temporal distortions during covid-19 have mainly been studied in Europe. The current study therefore sought to explore experiences of the passage of time in Iraq. An online questionnaire was used to explore the passage of time during the day, week and the 11 months since the first period of covid-19 restrictions were imposed in Iraq. The questionnaire also measured affective and demographic factors, and task-load. The results showed that distortions to the passage of time were widespread in Iraq. Participants consistently reported a slowing of the passage of time for the day and the week during the pandemic in comparison to normal (i.e. before the pandemic). Participants also reported that it felt like longer than 11-months since the first lockdown began. The passage of time during the day and week were not predicted by any demographic, affective or task-load measures taken in the study. The perceived length of time since the first lockdown was however predicted by stress and change of life due to covid, with greater stress and greater change of life being associated with greater subjective lengthening of the pandemic. The findings indicate that whilst distortions to the passage of time during covid-19 appear to be a global phenomenon, the factors which predict temporal experience during the pandemic differ between countries and cultures.
The construction sector is considered an important and influential pivot in the national economy of any country. Nations are working to develop this sector, receiving modern and developed techniques. So, this sector can be a carrier or a receiver of modern technologies. The cost of technology transfer between the international companies that sponsor this sector is a matter of great importance, especially since different factors affect the need for this advanced technology. The cost of technology transfer in construction is related to multiple factors presented by Knowledge, equipment, plant, hardware and software. The lack of distinguishing and evaluating the direct and indirect costs in the construction sector during
... Show MoreThe land cover of Mahmudiyah city, located south of the capital, Baghdad - Iraq, was studied for the period from 1986 to 2021 with five years between every two successive scenes, where Landsat scenes were used downloaded from the US Geological Survey (USGS ) website with low cloud cover for sensors TM and OLI. The land cover of the study area was classified. The total accuracy of the classification was calculated, as well as the analysis of the user accuracy and the classifier accuracy (maximum likelihood) and its impact on the overall classification accuracy. The lowest accuracy value in 2009 was (85.101% (and the highest accuracy value in 1995) was 95.654%). The constancy percentage of the class for the adopted years was calculated and
... Show MoreThis work studies with produce of light fuel fractions of gasoline, kerosene and gas oil from treatment of residual matter that will be obtained from the solvent extraction process as by product from refined lubricate to improve oil viscosity index in any petroleum refinery. The percentage of this byproduct is approximately 10% according to all feed (crude oil) in the petroleum refinery process. The objective of this research is to study the effect of the residence time parameter on the thermal cracking process of the byproduct feed at a constant temperature, (400 °C). The first step of this treatment is the thermal cracking of this byproduct material by a constructed batch reactor occupied with control device at a selective range of re
... Show MoreIt is frequently asserted that an advantage of a binary search tree implementation of a set over linked list implementation is that for reasonably well balanced binary search trees the average search time (to discover whether or not a particular element is present in the set) is O(log N) to the base 2 where N is the number of element in the set (the size of the tree). This paper presents an experiment for measuring and comparing the obtained binary search tree time with the expected time (theoretical), this experiment proved the correctness of the hypothesis, the experiment is carried out using a program in turbo Pascal with recursion technique implementation and a statistical method to prove th
... Show MoreThe implementation of the concept of project scheduling in the organizations generally requires a set of procedures and requirements, So, most important of all is the understanding and knowledge of the tools and techniques which are called the methods of scheduling projects. Consequently, the projects of the municipality administration in the holy governorate of Karbala suffer from the problem of delaying their projects and chaos in the ways of implementation. To provide assistance to this directorate and to demonstrate how to schedule projects using one of the advanced scientific methods that proved their ability to schedule any project and its potential to accelerate the time of completion, as well as ease of use and effectiven
... Show MoreApplying the constructability concept in the construction industry has proven many benefits in different projects; however, this concept still lacks usage in Iraq. Therefore, it is important to encourage usage of the constructability concept in the construction industry in Iraq. The main purpose of this study is to investigate the factors that affect constructability in Iraq and then classify them according to their importance. A total of 37 factors were collected from an intensive literature review, and they were classified under the sub and main categories. A survey was undertaken in two sessions with open questionnaire and close questionnaire. The results were analysed and the mean
The research aims to identify the importance of using the style of the cost on the basis of activity -oriented in time TDABC and its role in determining the cost of products more equitably and thus its impact on the policy of allocation of resources through the reverse of the changes that occur on an ongoing basis in the specification of the products and thus the change in the nature and type of operations . The research was conducted at the General Company for Textile Industries Wasit / knitting socks factory was based on research into the hypothesis main of that ( possible to calculate the cost of activities that cause the production through the time it takes to run these activities can then be re- distributed product cost
... Show More