Investigation the Opportunity of BIM with Agile Management Approach in Iraqi Construction Projects
...Show More Authors

The construction industry in Iraq suffers from many problems, perhaps the most important of which is the delay in time and the increase in costs. Therefore, it was necessary to try to adopt a new methodology that would help in overcoming these problems. It was suggested to combine building information modeling with the agile management approach because this technique and methodology is modern and helps in reducing time and cost and improving quality. This paper aims to know the status of using Building Information Modeling (BIM) and Agile Project management (APM) in Iraq and to shed light on the merging of this integration, explaining the benefits, difficulties, and workflow practices, finding the most influencing factors on the time, cost and quality of the project. For a comprehensive understanding, the literature was reviewed for each of BIM and Agile separately, and an initial field survey was conducted to diagnose the factors of greatest importance, and a second field survey was conducted to know the effect of the factors identified from the initial questionnaire on time, cost and quality. The results indicated the weak use of BIM in Iraq, where the non-use rate reached more than 60% and the rate may reach 75%. The agile methodology from the field survey sample is not used in this paper. The benefits that have been presented deserve to be overcome.

Crossref
View Publication
Publication Date
Mon Feb 01 2021
Journal Name
Journal Of Engineering
Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate
...Show More Authors

Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w

... Show More
View Publication Preview PDF
Crossref (6)
Crossref
Publication Date
Sat Aug 01 2015
Journal Name
Journal Of Economics And Administrative Sciences
Requirements high commitment management to achieve entrepreneurship strategic in busness organization / Field research in Iraqi construction companies
...Show More Authors

This research came to shed light on the relationship between the requirements of (practices) high commitment management (participative decision making،information sharing، training and development،team working،rewards،selective staffing،job security ) and strategic entrepreneurship dimensions (entrepreneurial culture،entrepreneurial leadership،entrepreneurial mindset، strategic management resources ) Sought to achieve the number of goals the knowledge and applied, and tested the relationship and impact between variables in a sample size of 100 directors of personnel departments and divisions and their associates in the Iraqi contractors in Baghdad (Hamorabi، Mutassim، AL Rasheed، AL Mansour  )، focused research

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Wed Dec 01 2021
Journal Name
Professional Safety
How Technology Can Improve OSH Management in Construction
...Show More Authors

Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
Application of Geographic Information System for Preparing the Bill of Quantities of Construction Projects
...Show More Authors

The information required for construction quantities surveying is not only generated by various participants in different construction phases but also stored in different forms including graphics, text, tables, or various combinations of the three. To report a bill of quantities (BOQ), the project manager has to continuously excerpt information from various resources and record it on papers. Without adequate staff and time, this repetitive and tedious process is difficult for the project manager to handle properly and thus reduces the effectiveness and the accuracy of the quantities surveying process which creates problems during the design, tender, and construction supervision of construction projects for designers and contractors pract

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
Laboratory Investigation on Roller Compaction Technique in Concrete Construction
...Show More Authors

Roller compacted concrete (RCC) is a concrete compacted by roller compaction. The concrete mixture in its unhardened state must support a roller while being compacted. The aim of this research work was to investigate the behavior and properties of roller compacted concrete when constructed in the laboratory using roller compactor manufactured in local market to simulate the field conditions. The roller compaction was conducts in three stages; each stage has different loading and number of passes of the roller. For the first stage, a load of (24) kg and (5) passes in each direction had been employed. For the second stage, a load of (104) kg and (10) passes in each direction were conducted. Finally, at the third stage, a load of (183) kg a

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Thu Feb 01 2024
Journal Name
Journal Of Engineering
Public Procurement Crisis of Iraq and its Impact on Construction Projects
...Show More Authors

 

The public procurement crisis in Iraq plays a fundamental role in the delay in the implementation of construction projects at different stages of project bidding (pre, during, and after). The procurement system of any country plays an important role in economic growth and revival. The paper aims to use the fuzzy logic inference model to predict the impact of the public procurement crisis (relative importance index and Likert scale) was carried out at the beginning to determine the most important parameters that affect construction projects, the fuzzy analytical hierarchy process (FAHP) to set up, and finally, the fuzzy decision maker's (FDM) verification of the parameter for comparison with reality. Sixty-five

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Jan 01 2020
Journal Name
Construction Research Congress
Exploratory Study of Potential Negative Safety Outcomes Associated with UAV-Assisted Construction Management
...Show More Authors

Scopus (9)
Scopus
Publication Date
Sun Apr 08 2018
Journal Name
Al-khwarizmi Engineering Journal
Building a Management System to Control the Construction Claims in Iraq
...Show More Authors

The paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Study on Safety Construction Management Plan
...Show More Authors

After studying the reality of application to occupational safety in new Iraqi building projects and sampling the situation wilt that in developed and neighboring countries, researcher found that there is a big gap in the level of safety application conditions, this indicates the need fora quick and clear reference for local engineers to use it on site for safety conditions in their projects . As a case study the monitors work the researcher studied a huge project in the United Arab Emirates.This project considered for safety requirements to highest grades. This case study may be far away from the projects in Iraq, but we hope to rise the Iraqi work level in the near future. After seeing the way of administration work and how they were ra

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Apr 22 2022
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
Developing models to predicting the effect of crises on construction projects using MLR technique
...Show More Authors

View Publication
Scopus (1)
Crossref (1)
Scopus Crossref