Infrastructure projects take a long time, are complex, multidisciplinary, use different materials and products, and have high risk. These characteristics affect the process of supplying materials. The current paper studies the ability to improve the supply chain process and decrease its cost by identifying the factors that affect it. These factors are used as variables in the mathematical model, which is working under uncertain conditions when the consumption rate of materials is not constant. The information used in this model is obtained from Building Information Modeling (BIM) and Geographical Information System (GIS) techniques and the genetic algorithm is utilized to determine the optimal supplier and the quantities of supplies for different materials. The case study used in this research is a concrete bridge. The obtained results show that the cost can decrease by about 28.2% by changing the supplier and the quantity of supplies.
The study aimed to identify the role of public relations management in its dimensions (mental image, media, advertising, and the public) on green human resource management practices in Jordanian private hospitals in Amman, and this study relied on the quantitative approach (descriptive and analytical) to test hypotheses. Where the questionnaire was relied upon to collect data and their number was (1771) workers, and the study population consisted of workers in the hospitals that were studied on them and their number was 10 hospitals, where 316 questionnaires were distributed, 300 questionnaires were retrieved, and 16 questionnaires were not valid for analysis. That is, 91.7% of the sample, and the study relied on proportional stratified
... Show MoreAbstract:
Sought the search to find out what small businesses, the importance of funding, and the role of funders in supporting such projects, which have been addressed in the search through a sample of government banks (Rafidain and Rasheed) and private banks (the Middle East, the Gulf, North, Assyria) and a sample of Small projects borrowed from these banks, but in order to achieve that rely researchers on scientific methods discreet marked by the curriculum descriptive analytical method which is based on the compilation of facts and information then collated and analyzed to reach acceptable results, as well as data collection tool (checklist) was whereby examine questions of a sample of
... Show MoreVariation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w
... Show MoreAbstract\
The value chain analysis is main tools to achieve effective and efficient cost management; it requires a depth and comprehensive understanding for all internal and external activities associated with creating value. Supply chain as apart of value chain, that means managing it in active and efficient can achieve great results when adopting a comprehensive and integrated performance for these two chains activities. The research aims to identify possible ways to integrate the performance of value and supply chains of the sample" Kufa-cement plant" and determine the effect of this integration in enhancing customer value. The research arrival that logical and integrated analysis of value and supply chains helps
... Show MoreThe aim of this research is to compare traditional and modern methods to obtain the optimal solution using dynamic programming and intelligent algorithms to solve the problems of project management.
It shows the possible ways in which these problems can be addressed, drawing on a schedule of interrelated and sequential activities And clarifies the relationships between the activities to determine the beginning and end of each activity and determine the duration and cost of the total project and estimate the times used by each activity and determine the objectives sought by the project through planning, implementation and monitoring to maintain the budget assessed
... Show MoreThe purpose of this study is to identify the extent of the EFL teachers’ implementationoftotal quality management (TQM)principles through teaching English as a foreign language in Iraqi secondary schools.A total of 180 EFL teachers fromsecondary schools in Baghdad during the academic year 2010/ 2011 participated in the study. Data was collected using a scale to identify the extent of implementation of total quality management principles by 140 EFL teachers in their classroom. To support the data collected from the scale,40 teachers were observed by EFL educational supervisors during their lessons. The collected data was analyzed using frequency, means and standard deviation to identify the extent of implementation of (TQM) principles.
... Show MoreThe cheif aim of the present investigation is to develop Leslie Gower type three species food chain model with prey refuge. The intra-specific competition among the predators is considered in the proposed model. Besides the logistic growth rate for the prey species, Sokol Howell functional response for predation is chosen for our model formulation. The behaviour of the model system thoroughly analyses near the biologically significant equilibria. The linear stability analysis of the equilibria is carried out in order to examine the response of the system. The present model system experiences Hopf bifurcation depending on the choice of suitable model parameters. Extensive numerical simulation reveals the validity of the proposed model.
The virtual decomposition control (VDC) is an efficient tool suitable to deal with the full-dynamics-based control problem of complex robots. However, the regressor-based adaptive control used by VDC to control every subsystem and to estimate the unknown parameters demands specific knowledge about the system physics. Therefore, in this paper, we focus on reorganizing the equation of the VDC for a serial chain manipulator using the adaptive function approximation technique (FAT) without needing specific system physics. The dynamic matrices of the dynamic equation of every subsystem (e.g. link and joint) are approximated by orthogonal functions due to the minimum approximation errors produced. The contr
The quality and cost of constructed buildings are heavily influenced by the performance of design/auditing consultants. Thus, selecting the right design consultant and design auditing consultants is of utmost importance and not an easy task for any construction client. so, the client should specify the efficiency criteria and assess the performance levels of the design and design auditing consultant firm. The study aims to identify the selection criteria of the design consultant in construction projects and also identify the selection criteria of the design auditing consultant for the construction projects by using the Delphi survey with applying the principal components analysis (PCA