This paper presents a three-dimensional Dynamic analysis of a rockfill dam with different foundation depths by considering the dam connection with both the reservoir bed and water. ANSYS was used to develop the three-dimensional Finite Element (FE) model of the rockfill dam. The essential objective of this study is the discussion of the effects of different foundation depths on the Dynamic behaviour of an embanked dam. Four foundation depths were investigated. They are the dam without foundation (fixed base), and three different depths of the foundation. Taking into consideration the changing of upstream water level, the empty, minimum, and maximum water levels, the results of the three-dimensional FE modelling of the rockfill dam show that adding the water effect decreases the natural frequencies of the system, but not more than 45%. While, with the increase of the reservoir water level of the dam from minimum to maximum, the natural frequencies of the dam decreased, but not more than 13% in the case of maximum water level changes. The results show that the influence of changing the upstream water level affects the horizontal displacement of the dam more than the vertical displacement.
Cloth simulation and animation has been the topic of research since the mid-80's in the field of computer graphics. Enforcing incompressible is very important in real time simulation. Although, there are great achievements in this regard, it still suffers from unnecessary time consumption in certain steps that is common in real time applications. This research develops a real-time cloth simulator for a virtual human character (VHC) with wearable clothing. This research achieves success in cloth simulation on the VHC through enhancing the position-based dynamics (PBD) framework by computing a series of positional constraints which implement constant densities. Also, the self-collision and collision wit
... Show MorePurpose: The diagnosis and determine the level of balance between the time available for life and work with the doctors in the hospitals of t the six hospitals in the City of Medicine.
Design / methodology / Approach: It has been relying on ready-scale, to make sure the diagnosis and determine the level of balance between the time available for life and work, where they were distributed on Form 42 doctors in the six hospitals in the City of Medicine, were analyzed by software (Nvivo and SPSS v.22).
Results: The results showed that there is a good level of balance between the time available for life and work with the doctors.
Research limitations: The diffi
... Show MoreThe present study included the physico-chemical parameters of Lesser-Zab river and its effects on Tigris river. Monthly water samples were taken from the two rivers during January to October 1999.There were no signifcant difference in water temperatures. Both rivers were fresh to oligohalin, alkaline and very hard. Close values were determined in total suspended solids in both rivers with little increasing during rainfall period and high discharge. Water was well areated and over saturation was recorded in several occasions. Dissolved oxygen values of Tigris river were influenced by Lesser-Zab. Cations were more dominant than anions in both rivers. In Lesser-Zab, the anions were increased during spring season and declined in summer which t
... Show MoreThis study was undertaken to provide more insight on the optimum injection temperature used for the production of PE crates, thereby saving time and money, and improving part quality. The work included processing trails of HDPE crates in an injection
molding machine at five temperatures ranged from 220 to 300°C. Both Rheological and mechanical characterization was conducted in order to understand the effect of injection temperature on the properties of crates. Oven aging was also applied for (4 weeks) to evaluate the long-term thermal stability. The results revealed that producing the crates at a temperature range of (260-280 °C) gives the best rheological and mechanical result. The lowest drop in thermal stability has been observed
This experimental study focuses on scouring in box culvert inlets under steady-state conditions and at different percentages of blockage ranging from 0% to 65%, and also looks at the hydraulics of water in the culvert. The investigation shows that the blockage of the culverts has influenced the scouring pattern at the blocked culverts' entrances. Ten experiments were carried out at the laboratory to see how blockage impacts the scouring pattern upstream of a box culvert during steady flow. Both partially blocked and unblocked cases were implemented in this study. The experimental tests were done until the equilibrium scour occurred, which took about 3.5 hours of water flow to reach equilibrium conditions. The results r
... Show MoreThis study is conducted in order to, investigate the trophic state of Duhok Lake Dam located within Duhok city, Iraq. Water samples are collected seasonally from three monitored sites during 2011. The parameters used for assessing water quality and trophic status level include: water temperature, pH, EC, TDS, DO, BOD5, nutrients, Secchi disk transparency, and chlorophyll a. The results reveal that DO is above 5 mg.l-1 in all sites, BOD5 value is within permissible level for domestic uses. Water quality considered as a hard type. High sulfate concentration is recorded during the study period. Trophic state shows that water type is classified as mesotrophic during autumn season, while it is regarded as eutrophic in other seasons. TDN/TDP rati
... Show MoreDiverting river flow during construction of a main dam involves the construction of cofferdams, and tunnels, channels or other temporary passages. Diversion channels are commonly used in wide valleys where the high flow makes tunnels or culverts uneconomic. The diversion works must form part of the overall project design since it will have a major impact on its cost, as well as on the design, construction program and overall cost of the permanent works. Construction costs contain of excavation, lining of the channel, and construction of upstream and downstream cofferdams. The optimization model was applied to obtain optimalchannel cross section, height of upstream cofferdam, and height of downstream cofferdamwith minimum construction cost
... Show More
