This paper presents a three-dimensional Dynamic analysis of a rockfill dam with different foundation depths by considering the dam connection with both the reservoir bed and water. ANSYS was used to develop the three-dimensional Finite Element (FE) model of the rockfill dam. The essential objective of this study is the discussion of the effects of different foundation depths on the Dynamic behaviour of an embanked dam. Four foundation depths were investigated. They are the dam without foundation (fixed base), and three different depths of the foundation. Taking into consideration the changing of upstream water level, the empty, minimum, and maximum water levels, the results of the three-dimensional FE modelling of the rockfill dam show that adding the water effect decreases the natural frequencies of the system, but not more than 45%. While, with the increase of the reservoir water level of the dam from minimum to maximum, the natural frequencies of the dam decreased, but not more than 13% in the case of maximum water level changes. The results show that the influence of changing the upstream water level affects the horizontal displacement of the dam more than the vertical displacement.
Oyster mushroom (Pleurotus ostreatus (Jacq. ex Fr.) P. Kumm.) is involved in the destruction of dead wood which is the main place of settlement of several living organisms. After humification, dead wood also becomes an important component of forest soils.
The purpose of the research is to study temperature and moisture conditions of extensive cultivation of oyster mushrooms on various wood substrates. To accomplish this goal, the following tasks were set: to determine the amount of effective stress temperatures and moisture content of substrates and their influence on the appearance of fruiting bodies of the oyster mushroom; to study the features of the extensive culti
... Show MoreThe research aims to get acquainted with the evaluation of the reality of the application of the curriculum axis from among the eight Iraqi academic accreditation standards in a sample of governmental and private universities and colleges in Iraq and to identify the main and secondary reasons for it as well as to provide proposed mechanisms and procedures to help reduce gaps, If the research problem is represented in the weak availability of the requirements of the curriculum axis in universities and colleges (the study sample) due to the weak documentation and successful implementation of them and interest in them is still below the level of ambition, In order to arrive at scientific facts, the researchers adopted the comparativ
... Show MoreEarth dams are constructed mainly from soil. A homogenous earth dam is composed of only one material. The seepage through such dams is quite high. Upstream impervious blanket is one of the methods used to control seepage through the dam foundations. Bennet's method is one of the commonly used methods to design an impervious upstream blanket. Design charts are developed relating the length of blanket, total reservoir head, total base width of the dam (excluding downstream drainage), the coefficient of permeability of the blanket material, blanket thickness, foundation thickness, and coefficient of permeability of the foundation soil, based on the equations governing the Bennet's method for a homogenous earth dam with a blanket of uniform
... Show MoreAO Dr. Ali Jihad, Journal of Physical Education, 2021
The placement of buildings and structures on/or adjacent to slopes is possible, but this poses a danger to the structure due to failures that occur in slopes. Therefore, a solution or improvement should be determined for these issues of the collapse of the structure as a result of the failure of the slopes. A laboratory model has been built to test the impact of some variables on the bearing capacity factor. The variables include the magnitude of static axial load applied at the center of footing, the depth of embedment, the spacing between geogrid reinforcement layer and the numbering of the geogrid sheet under the footing, the inclination angle of slope clayey soil (β), the spacing between the footing's edge and the slope's end (b/H). Th
... Show MoreAdvancements and modernizations introduced into the educational and pedagogical systems have significantly impacted teaching processes and how subjects are presented and explained to students. The focus has shifted to how learners interact with the material they need to learn, providing sufficient opportunities for learning and granting them freedom and self-confidence to achieve learning objectives. The research problem stems from the researcher's experience as a lecturer in the College of Physical Education and Sports Science, particularly in teaching basketball. She observed that some instructors were deficient in using the most effective teaching methods. The researcher formulated her research question based on these observations: "What
... Show MoreThe present study aims to evaluate the effects of methotrexate (MTX) with and without vitamin A (Vit. A) on some biochemical parameters and histological structure in male rabbits liver. Twenty male rabbits weighing 1250-1480 gm were divided into four equal number groups. The first group was given 2 ml distilled water as control group. The second group was given MTX (20 mg/kg), the third group was given Vit. A (5000 IU), while the fourth group was given MTX (20 mg/kg) +Vit. A (5000 IU) in alternative days. Following four weeks of treatment, lipid profile total cholesterol (TC), triglycerides (TG), high-density lipoprotein (HDL), [low-density lipoprotein (LDL) and very low-density lipoprotein (VLDL)]; in addition to thyroid hormones tr
... Show Moreten albino male rates were orally treated daily 20% and 30% ethanol for 30 days treatment with 30%ethanol caused of hippocampuse of darckness google hospital patients
The aim of this research is to compare traditional and modern methods to obtain the optimal solution using dynamic programming and intelligent algorithms to solve the problems of project management.
It shows the possible ways in which these problems can be addressed, drawing on a schedule of interrelated and sequential activities And clarifies the relationships between the activities to determine the beginning and end of each activity and determine the duration and cost of the total project and estimate the times used by each activity and determine the objectives sought by the project through planning, implementation and monitoring to maintain the budget assessed
... Show More