As the reservoir conditions are in continuous changing during its life, well production rateand its performance will change and it needs to re-model according to the current situationsand to keep the production rate as high as possible.Well productivity is affected by changing in reservoir pressure, water cut, tubing size andwellhead pressure. For electrical submersible pump (ESP), it will also affected by numberof stages and operating frequency.In general, the production rate increases when reservoir pressure increases and/or water cutdecreases. Also the flow rate increase when tubing size increases and/or wellhead pressuredecreases. For ESP well, production rate increases when number of stages is increasedand/or pump frequency is increased.In this study, a nodal analysis software was used to design one well with natural flow andother with ESP. Reservoir, fluid and well information are taken from actual data of Mishrifformation-Nasriya oil field/ NS-5 well. Well design steps and data required in the modelwill be displayed and the optimization sensitivity keys will be applied on the model todetermine the effect of each individual parameter or when it combined with another one.
Stable isotopes 18O/16O and 13C/12C in the carbonate rocks of the Mishrif Formation are examined here to define the depositional characters in the basin includes paleo temperatures and paleo depth. The Mishrif formation (Cenomanian – Early Turonian) has extensive distribution in Iraq and Middle East. Mishrif Formation composed of organic detrital limestone. Four boreholes in four oilfields, Noor – well (11), Amarah – well (14), Buzurgan – well (24), Halfaya – well (8), in south east of Iraq have been studied. The studied samples have negative δ18O isotope values studied well, with Average (-4.11‰), (-4.47‰), (-4.48‰), (-4.18‰) in the studied wells res
... Show MoreThis study aims at suggesting flow as a strategy for training female EFL student-teachers in the teaching training course and finding out the effect of this strategy on their performance and their flow state. The training course syllabuses will be constructed according to the flow nine factors and the teaching skills. The measurement tools are the student-teacher performance checklist that has already been used by the department of English language and SHORT Flow State Scale (S FSS-2). The study population is represented with the (60) female student-teachers/ fourth stage/ evening studies at theEnglish department /college of education for women/the University of Baghdad. The study is used the experimental design in that (30) of the student-
... Show MoreOver the last few decades, many instructors have been trying all kinds of teaching methods, but without benefit. Nevertheless, in the 1986, a new technique is appeared which called K-W-L technique, it is specified for reading comprehension passages because reading skill is not easy matter for students for specific purposes (ESP).therefore, the K-W-L technique is a good one for thinking and experiences. To fulfill the aims and verify the hypothesis which reads as follows" it is hypothesized that there are no significant differences between the achievements of students who are taught according to K-W-L technique and those who are taught according to the traditional method
... Show MoreAs tight gas reservoirs (TGRs) become more significant to the future of the gas industry, investigation into the best methods for the evaluation of field performance is critical. While hydraulic fractured well in TRGs are proven to be most viable options for economic recovery of gas, the interpretation of pressure transient or well test data from hydraulic fractured well in TGRs for the accurate estimation of important reservoirs and fracture properties (e.g. fracture length, fracture conductivity, skin and reservoir permeability) is rather very complex and difficult because of the existence of multiple flow profiles/regimes. The flow regimes are complex in TGRs due to the large hydraulic fractures n
Drilling with casing (DWC) can be considered as a modern drilling technique in which both of drilling and casing operations done in the same time by using the casing to transfer the hydraulic and mechanical power to the bit instead of traditional drilling string. To overcome oil well control, minimizing the total cost through enhancing drilling efficiency, drilling with casing was proposed as an enabling technology.
Two surface sections (17 1/2 - and 12 1/4- inch) were drilled successfully in Rumaila oil field with casing strings which reached 655m and 1524m measured depths respectively.
By using DWC technique, the total drill/case phase time was reduced up to 20% comparing to conventional
... Show MoreThe petrophysical analysis is significant to determine the parameters controlling the production wells and the reservoir quality. In this study, Using Interactive petrophysics software to analyze the petrophysical parameters of five wells penetrated the Zubair reservoir in the Abu-Amood field to evaluate a reservoir and search for hydrocarbon zones. The available logs data such as density, sonic, gamma ray, SP, neutron, and resistivity logs for wells AAm-1, AAm-2, AAm-3, AAm-4, and AAm-5 were used to determine the reservoir properties in Zubair reservoir. The density-neutron and neutron-sonic cross plots, which appear as lines with porosity scale ticks, are used to distinguish between the three main lithologies of sandstone, limesto
... Show MoreWell integrity is a vital feature that should be upheld into the lifespan of the well, and one constituent of which casing, necessity to be capable to endure all the interior and outside loads. The casing, through its two basic essentials: casing design and casing depth adjustment, are fundamental to a unique wellbore that plays an important role in well integrity. Casing set depths are determined based on fracturing pressure and pore pressure in the well and can usually be obtained from well-specific information. Based on the analyzes using the improved techniques in this study, the following special proposition can be projected: The selection of the first class and materials must be done correctly and accurately in accordance with the
... Show MoreWell integrity is a vital feature that should be upheld into the lifespan of the well, and one constituent of which casing, necessity to be capable to endure all the interior and outside loads. The casing, through its two basic essentials: casing design and casing depth adjustment, are fundamental to a unique wellbore that plays an important role in well integrity. Casing set depths are determined based on fracturing pressure and pore pressure in the well and can usually be obtained from well-specific information. Based on the analyzes using the improved techniques in this study, the following special proposition can be projected: The selection of the first class and materials must be done correctly and accurately in accordance with
... Show More