The quality and cost of constructed buildings are heavily influenced by the performance of design/auditing consultants. Thus, selecting the right design consultant and design auditing consultants is of utmost importance and not an easy task for any construction client. so, the client should specify the efficiency criteria and assess the performance levels of the design and design auditing consultant firm. The study aims to identify the selection criteria of the design consultant in construction projects and also identify the selection criteria of the design auditing consultant for the construction projects by using the Delphi survey with applying the principal components analysis (PCA). The results of the present study showed that there are 13 key criteria for selecting the design consultant, where the criterion of “Efficiency and experience of the company/consultant in previous work” was of the highest importance. While there are Ten key criteria for selecting the design auditing consultant for the construction project, where the criterion of “Credibility and professional integrity (transparency, professional conduct, and ethics)” was of the highest importance in the decision-making process. Moreover, the results of applying PCA on the Delphi survey outcomes showed that all the resulting selection criteria are most valuable and suitable for the selection process in construction projects.
Diverting river flow during construction of a main dam involves the construction of cofferdams, and tunnels, channels or other temporary passages. Diversion channels are commonly used in wide valleys where the high flow makes tunnels or culverts uneconomic. The diversion works must form part of the overall project design since it will have a major impact on its cost, as well as on the design, construction program and overall cost of the permanent works. Construction costs contain of excavation, lining of the channel, and construction of upstream and downstream cofferdams. The optimization model was applied to obtain optimalchannel cross section, height of upstream cofferdam, and height of downstream cofferdamwith minimum construction cost
... Show MoreABSTRACT: BACKGROUND: Left ventricular hypertrophy is a significant risk factor for cardiovascular complications such as ischemic heart disease, heart failure, sudden death, atrial fibrillation, and stroke. A proper non-expensive tool is required for detection of this pathology. Different electrocardiographic (ECG) criteria were investigated; however, the results were conflicting regarding the accuracy of these criteria. OBJECTIVE: To assess the accuracy of three electrocardiographic criteria in diagnosis of left ventricular hypertrophy in adult patients with hypertension using echocardiography as a reference test. PATIENTS AND METHODS: This is a hospital-based cross sectional observational study which included 340 adult patients with a his
... Show MoreGlobally, Sustainability is very quickly becoming a fundamental requirement of the construction industry as it delivers its projects; whether buildings or infrastructures. Throughout more than two decades, many modeling schemes, evaluation tools, and rating systems have been introduced en route to realizing sustainable construction. Many of these, however, lack consensus on evaluation criteria, a robust scientific model that captures the logic behind their sustainability performance evaluation, and therefore experience discrepancies between rated results and actual performance. Moreover, very few of the evaluation tools available satisfactorily address infrastructure projects. The res

Water supply projects (WSP) requires high plan information, specialized capabilities, capable human resources, and high administrative capacity. However, in the developing countries, particularly in Iraq, these projects experience a lack of a large number of these necessities, which shows the need to identify the critical success factors (CSFs). Accordingly, the objectives of this research are to investigate the CSFs for WSP and their significance among the construction (public and private) and education sectors. To achieve this, first we have carried out a comprehensive literature review of the CSFs for WSP. Second, we administrated a questionnaire survey to 260 construction experts
Cancer is in general not a result of an abnormality of a single gene but a consequence of changes in many genes, it is therefore of great importance to understand the roles of different oncogenic and tumor suppressor pathways in tumorigenesis. In recent years, there have been many computational models developed to study the genetic alterations of different pathways in the evolutionary process of cancer. However, most of the methods are knowledge-based enrichment analyses and inflexible to analyze user-defined pathways or gene sets. In this paper, we develop a nonparametric and data-driven approach to testing for the dynamic changes of pathways over the cancer progression. Our method is based on an expansion and refinement of the pathway bei
... Show MoreThe project has been described the design and construction of a reliable optical testing platform used for evaluate the reflectivity of metal surfaces treated with special paintings required for laser beam attenuation. The platform comprises an Nd-YAG laser system which has been designed and fabricated with specifications to be compatible with their corresponding in laser range finder transmitters used for various applications. The reflectivity of various attenuating paintings, at different detection angles, has been observed. Moreover, the variation of the reflected energy with painting type and metal type to be painted has been studied experimentally. Results illustrated the existence of a definite angle, at which the reflectivity was max
... Show MoreA low speed open circuit wind tunnel has been designed, manufactured and constructed at the
Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of
the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the
first part of the work; that is the design calculations, simulation and construction. It will be followed by a
second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test
section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70
m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow
distu