Nasryia oil field is located about 38 Km to the north-west of Nasryia city. The field was discovered in 1975 after doing seismic by Iraqi national oil company. Mishrif formation is a carbonate rock (Limestone and Dolomite) and its thickness reach to 170m. The main reservoir is the lower Mishrif (MB) layer which has medium permeability (3.5-100) md and good porosity (10-25) %. Form well logging interpretation, it has been confirmed the rock type of Mishrif formation as carbonate rock. A ten meter shale layer is separating the MA from MB layer. Environmental corrections had been applied on well logs to use the corrected one in the analysis. The combination of Neutron-Density porosity has been chosen for interpretation as it is close to core porosity. Archie equation had been used to calculate water saturation using corrected porosity from shale effect and Archie parameters which are determined using Picket plot. Using core analysis with log data lead to establish equations to estimate permeability and porosity for non-cored wells. Water saturation form Archie was used to determine the oil-water contact which is very important in oil in place calculation. PVT software was used to choose the best fit PVT correlation that describes reservoir PVT properties which will be used in reservoir and well modeling. Numerical software was used to generate reservoir model using all geological and petrophysical properties. Using production data to do history matching and determine the aquifer affect as weak water drive. Reservoir model calculate 6.9 MMMSTB of oil as initial oil in place, this value is very close to that measured by Chevron study on same reservoir which was 7.1 MMMSTB. [1] Field production strategy had been applied to predict the reservoir behavior and production rate for 34 years. The development strategy used water injection to support reservoir pressure and to improve oil recovery. The result shows that the reservoir has the ability to produce oil at apparently stable rate equal to 85 Kbbl/d, also the recovery factor is about 14%.
This work was conducted to study the recovery of catalyst and desirable components from tar formed in phenol production unit and more particularly relates to such a method whereby better recovery of copper salts, phenol, benzoic acid and benzoate salts from tar by aqueous acid solution was accomplished.
The effect of solvent type, solvent concentration (5, 10, 15, 20, 25 and 30 wt%), agitation speed (100, 200, 300 and 400 rpm), agitation time (5, 10, 15, 20 and 25 min), temperature (90, 100, 110, 120, 130 and 140 oC) , phase ratio (1/1, 2/1, 3/1, 4/1 and 5/1) and number of extraction (1, 2, 3, 4, and 5) were examined in order to increase the catalyst and desirable components extraction.
Four types of solvent were used; hydrochloric
A total of 37 Staphylococcus epidermidis isolates, isolated from corneal scraping of patients with bacterial keratitis and 20 isolates from healthy eyes (as control) (all isolates, isolated from, Ibn Al- Haietham eye hospital / Baghdad), were tested for slime production, 52.63% of all isolates were positive-slime production (23 isolates from patients and 7 isolates from controls). It was found that positive-slime producing S. epidermidis were exhibited a high resistance to antibiotics as compared to negative-slime producing isolates.
Economic units can benefit from the cleaner production strategy, which aims to reduce the environmental impact of economic activities while improving efficiency and profitability. Accordingly, the aim of the research was to clarify the knowledge foundations of cleaner production costs and to indicate their role in reducing the costs of poor quality (the costs of failure). A set of conclusions has been reached, the most important of which is that cleaner production has achieved a reduction in the costs of external failure, represented by the costs of guarantee, by an amount of 12,339,000 dinars. Contributes to reducing the costs of failure, and based on the conclusions, a set of recommendations were presented, the most important of w
... Show MoreThis research is concerned with a new type of ferrocement characterized by its lower density and enhanced thermal insulation. Lightweight ferrocement plates have many advantages, low weight, low cost, thermal insulation, environmental conservation. This work contain two group experimental : first different of layer ferrocement, second different of ratio aggregate to cement. The experiments were made to determined the optimum proportion of cement and lightweight aggregate (recycle thermestone ). A low W/C ratio of 0.4 was used with super plasticizer conforming to ASTM 494 Type G. The compressive strength of the mortar mixes is 20-25 MPa. The work also involved the determination of thermal properties .Thermal conductivity value of thi
... Show MoreAbstract
The goal of current research to describe and diagnose the level of attention of doctors to design and regulatory dimensions, (strategic vision, organizational structure, organizational processes, business systems, personnel), and the performance of hospitals and dimensions, in six hospitals in medicine and selected a sample for research, as well as identify organizational design effect in the performance of hospitals and dimensions (efficiency, the development of human resources, patient satisfaction, achieve financial results, quality of health care).
Research has focused in part theoretical on key variables to look organizational des
... Show MoreThere are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alternatives including side-tracking. The drilling in Khabaz oil field poses many operational challenges among of them stuck pipe , lost circulation, flow of salt water during drilling, and hole caving. Stuck pipe can be considered the quite difficult problem in Khabaz oil field due to associated incidents which lead to NPT activities.
Well Khabaz -34 was selected to study the problem of stuck pipe in this field. An analysis of stuck pipe event
Education is the most powerful and important weapon in fighting poverty and unemployment because it provides students with new skills that appropriate the new market requirements and fair distribution of natural resources. It also transfers knowledge, skills, and ethics over generations. Education aims to create effective leaders who go under training and rehabilitation process, create a new human and instill faith, generate the creativity and innovation, and keep abreast with scientific process, updating curriculum, and finally, applying the technical education
There are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alternatives including side-tracking. The drilling in Khabaz oil field poses many operational challenges among of them stuck pipe , lost circulation, flow of salt water during drilling, and hole caving. Stuck pipe can be considered the quite difficult problem in Khabaz oil field due to associated incidents which lead to NPT activities.Well Khabaz -34 was selected to study the problem of stuck pipe in this field. An analysis of stuck pipe even
... Show MoreHorizontal wells are of great interest to the petroleum industry today because they provide an attractive means for improving both production rate and recovery efficiency. The great improvements in drilling technology make it possible to drill horizontal wells with complex trajectories and extended for significant depths.
The aim of this paper is to present the design aspects of horizontal well. Well design aspects include selection of bit and casing sizes, detection of setting depths and drilling fluid density, casing, hydraulics, well profile, and construction of drillstring simulator. An Iraqi oil field (Ajeel field) is selected for designing horizontal well to increase the productivity. Short radius horizontal well is suggested fo