ABSTRACT:. The Lower Cretaceous Zubair formation is comprised of sandstones intercalated with shale sequences. The main challenges that were encountered while drilling into this formation included severe wellbore instability-related issues across the weaker formations overlaying the reservoir section (pay zone). These issues have a significant impact on well costs and timeline. In this paper, a comprehensive geomechanical study was carried out to understand the causes of the wellbore failure and to improve drilling design and drilling performance on further development wells in the field. Failure criteria known as Mogi-Coulomb was used to determine an operating mud weight window required for safe drilling. The accuracy of the geomechanical model was examined by comparing predicted wellbore instability with the actual wellbore failure shown on caliper logs at a given mud weight. The analysis identified the cause of wellbore instability, as being inadequate mud weight while drilling the overlying shale formation. In addition, this case demonstrated that the safe operating mud weight window was found in the range of 1.35–1.55 g/cc, while 1.21 g/cc had been applied in practice. The results of this study can be used as a reference for optimal mud weight selection to mitigate wellbore-stability problems in nearby wells in this field.
The research aims to assess the claystone exposed in the Nfayil Formation (Middle Miocene) for Portland cement (P.C.) manufacturing based on mineralogy and geochemistry. The importance of the study is to avoid the miming of the agricultural soils that are mining now for the cement industry. Claystones of Nfayil Formation and the limestone of the Euphrates Formation were used to design the raw mixture as clay to limestone (1:3). The chemical composition (%) of the designed mixture was calculated using the Alligation Alternative Method (A.A.M.) as CaO (65.52), MgO (1.05), SiO2 (21.65), Al2O3 (7.43), Fe2O3 (2.62), Na2O3+K2O (1.52) and SO3 (0.26), which are suitable for P.C. The lime saturation factor (LSF = 92.8), silica saturation fac
... Show MoreConstructing a fine 3D geomodel for complex giant reservoir is a crucial task for hydrocarbon volume assessment and guiding for optimal development. The case under study is Mishrif reservoir of Halfaya oil field, which is an Iraqi giant carbonate reservoir. Mishrif mainly consists of limestone rocks which belong to Late Cenomanian age. The average gross thickness of formation is about 400m. In this paper, a high-resolution 3D geological model has been built using Petrel software that can be utilized as input for dynamic simulation. The model is constructed based on geological, geophysical, pertophysical and engineering data from about 60 available wells to characterize the structural, stratigraphic, and properties distri
... Show MoreConstructing a fine 3D geomodel for complex giant reservoir is a crucial task for hydrocarbon volume assessment and guiding for optimal development. The case under study is Mishrif reservoir of Halfaya oil field, which is an Iraqi giant carbonate reservoir. Mishrif mainly consists of limestone rocks which belong to Late Cenomanian age. The average gross thickness of formation is about 400m. In this paper, a high-resolution 3D geological model has been built using Petrel software that can be utilized as input for dynamic simulation. The model is constructed based on geological, geophysical, pertophysical and engineering data from about 60 available wells to characterize the structural, stratigraphic, and properties distribution along
... Show MorePrediction of the formation of pore and fracture pressure before constructing a drilling wells program are a crucial since it helps to prevent several drilling operations issues including lost circulation, kick, pipe sticking, blowout, and other issues. IP (Interactive Petrophysics) software is used to calculate and measure pore and fracture pressure. Eaton method, Matthews and Kelly, Modified Eaton, and Barker and Wood equations are used to calculate fracture pressure, whereas only Eaton method is used to measure pore pressure. These approaches are based on log data obtained from six wells, three from the north dome; BUCN-52, BUCN-51, BUCN-43 and the other from the south dome; BUCS-49, BUCS-48, BUCS-47. Along with the overburden pressur
... Show MorePhytoplankton community is a model for of monitoring aquatic systems and interpreting the environmental change in aquatic systems. The present study aimed to forecast environmental parameters that drive the change of phytoplankton community structure in the lake. The present study was carried out in Baghdad Tourist Island Lake (BTIL) for the period From October 2021 to May 2022. The study included the quality and quantity of phytoplankton, moreover, the highest and lowest value of the physical and chemical parameters were (Water temperature (13-30 °C), Light penetration (94-275cm), electric conductivity (837-1128 µS/cm), salinity (0.5-0.7 ‰), pH (7-8.2), total alkalinity (126-226 mg CaCO3/L), total Hardness (297-395 mg CaCO3/L
... Show MorePhytoplankton community is a model for of monitoring aquatic systems and interpreting the environmental change in aquatic systems. The present study aimed to forecast environmental parameters that drive the change of phytoplankton community structure in the lake. The present study was carried out in Baghdad Tourist Island Lake (BTIL) for the period From October 2021 to May 2022. The study included the quality and quantity of phytoplankton, moreover, the highest and lowest value of the physical and chemical parameters were (Water temperature (13-30 °C), Light penetration (94-275cm), electric conductivity (837-1128 µS/cm), salinity (0.5-0.7 ‰), pH (7-8.2), total alkalinity (126-226 mg CaCO3/L), total Hardness (297-395 mg CaCO3/L), Ca
... Show MoreThe importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A selected 75 engineer (department managers, project managers and engineers) are asked to fill the questionnaire form, Sixty-seven valid questionnaire forms were analyzed statistically to get search results, which were as follows : Twe
... Show More