Single-Phase Grid-Tied Transformerless Inverter of Zero Leakage Current for PV System
...Show More Authors
Iraqi bentonite is used as main material for preparing ceramic samples with the additions of alumina and magnesia. X-ray diffractions analyses were carried out for the raw material at room temperature. The sequence of mineral phase's transformations of the bentonite for temperatures 1000 ,1100 ,1200 and 1250 ºC reflects that it finally transformed in to mullite 39.18% and cristobalite 62.82%. Samples of different weight constituent were prepared. The effect of its constitutional change reveals through its heat treatments at 1000,1100,1200,1250and 1300ºC .The samples of additions less than 15% of alumina and magnesia could not stand up to 1300ºC while the samples of addition more than 15% are stable .That is shown by analy
... Show MoreThe acute phase response is a major pathophysiologic phenomenon that accompanies inflammation whether acute or chronic. Complement (C3 and C4) and C - reactive protein (CRP) are positive acute phase proteins (+ ve APPs ). Their production takes place in hepatocyte and the blood concentration of these parameters are increased in osteoarthritis (OA). Chloroquine (CQ) is a diprotic weak base traditionally used to treat malaria. Recently the phosphate salt of CQ is used to decrease this type of (+ve APPs) . In this study, patients who suffered from knee osteoarthritis (KOA) are treated with oral dosage form of chloroquine phosphate (CQP) for one month, twice daily. Our results demonstrate that CQP improves the patient status by decreas
... Show MoreCollapse of the vapor bubble condensing in an immiscible is investigated for n-pentane and n-hexane vapors condensing in cold water and n-pentane in two different compositions of glycerin- water mixture. The rise velocity and the drag coefficient of the two-phase bubble are measured.
The objective of this work is to investigate the performance of a conventional three phase induction motor supplied by unbalanced voltages. An effort to study the motor steady state performance under this disturbance is introduced. Using per phase equivalent circuit analysis with the concept of symmetrical components approach, the steady state performance is theoretically calculated. Also, a model for the induction motor with the MATLAB/Simulink SPS tools has been implemented and steady state results were obtained. Both results are compared and show good correlation as well. The simulation model is introduced to support and enhance electrical engineers with a complete understanding for the steady state performance of a fully loaded induc
... Show MoreThe actual observations for Jupiter radio storm were taken for Hawaii station within multi years from 2001 to 2012. The Central Meridian Longitude (CMLІІІ) and Io's phase (γIo) were calculated for each year from Radio Jove program, the results of CMLІІІ for year 2006 was A=(180-300)º,B=(15-239)º, C=(60-280)º, phase was A=(182-260)º,B=(40-109)º, C=(200-260)º, which were close to the theoretical values, longitude was A=(180-300)º, B=(15-240)º, C=(60-280)º and phase was A=(180-260)º,B=(40-110)º and C=(200-260)º.
In this paper, the homotopy perturbation method (HPM) is presented for treating a linear system of second-kind mixed Volterra-Fredholm integral equations. The method is based on constructing the series whose summation is the solution of the considered system. Convergence of constructed series is discussed and its proof is given; also, the error estimation is obtained. Algorithm is suggested and applied on several examples and the results are computed by using MATLAB (R2015a). To show the accuracy of the results and the effectiveness of the method, the approximate solutions of some examples are compared with the exact solution by computing the absolute errors.
The information required for construction quantities surveying is not only generated by various participants in different construction phases but also stored in different forms including graphics, text, tables, or various combinations of the three. To report a bill of quantities (BOQ), the project manager has to continuously excerpt information from various resources and record it on papers. Without adequate staff and time, this repetitive and tedious process is difficult for the project manager to handle properly and thus reduces the effectiveness and the accuracy of the quantities surveying process which creates problems during the design, tender, and construction supervision of construction projects for designers and contractors pract
... Show More