The government of Iraq states that despite the massive amounts invested in the power generating sector, the country has been plagued by power outages for more than three decades; One of the most common sources of the problem and significant impact on the waste of public funds in contractual processes. The Ministry of Planning issued the sectorial
specialized standard bidding documents (SSBD) of Design, Supply, and Installation of the Electromechanical Works (DSIoEW), which is primarily designed to support the Ministry of Electricity (MoE) by developing economic projects to improve the contractual process that led to raisings Iraqi electricity generation field. The research evaluates the impact of
applying the SSBD-DSIoEW for
IFRS 17 aims to provide a unified basis for accounting for all types of insurance contracts, including reinsurance contracts, in a manner that benefits both investors and insurance companies and enhances the ability of the financial statements of insurance companies for comparison between companies listed in financial markets around the world. According to this standard, insurance contracts are accounted for on the basis of the Asset-Liability Approach and the use of fair values that the standard requires updating regularly in order to provide more useful information to the users of financial statements, as a result of the failure of reporting requirements for insurance contr
... Show MoreFacing the Iraqi economy, a number of economic challenges that threaten the future of Iraq and the security of economic, political and social, such as poverty, unemployment, inflation and the dilapidated infrastructure and rising production costs and administrative and financial corruption, environmental pollution, water problems and the deterioration of agricultural and industrial production, etc., and over the seriousness of these challenges, they are intertwined and overlapping and growing worse, without the corresponding adoption of state strategies that will develop appropriate solutions and appropriate to resolve those challenges because of concern the subject of security and terrorism, which requires the development of an
... Show MoreControlling cost in construction projects is an essential issue. This study investigates the most critical problems that cause weakness in cost control in Iraqi construction projects. The quantitative technique was used by conducting a survey directed to professionals who work on construction projects. One hundred and sixty-four questionnaire forms were distributed to private sector companies, government companies, and government institutions, and the responses were subjected to the required statistical analysis. The results indicate that the most influential factors are the weakness in keeping up with the use of modern concepts, methods, and technologies, the delay in receiving the amounts due for work done from the owner, fluctuat
... Show MoreContracting companies play a prominent role today in economic activity, due to their contribution to the implementation of major construction projects which together constitute the infrastructure of society. Most construction projects also suffer from exceeding the time and cost specified and planned for the completion of the project, and this comes for several reasons, including the work environment, country conditions, The method of managing project costs and the techniques used in its implementation Accordingly, the concepts of lean construction came, which help in addressing the causes of waste, both in time and cost, in addition to the fact that project management needs techniques that are useful in controlling the control and manag
... Show MoreThe most used material in the world after water is concrete, which depends mainly on its manufacture of cement leading to the emission of carbon dioxide (CO2), flying dust, and other greenhouse gasses (GHGs) resulting in pollution of the atmosphere. The emission of CO2 from cement production is approximately 5% of the global anthropogenic CO2. This research focuses on investigating the amount of CO2 emission from the Iraqi General Cement Company plants includes the cement factories of Kirkuk, Al-Qa’em, Fallujah, and Kubaisa, using the GHGs Protocol Measures Program (specifically cement based-method).