The goal of this research is to develop a numerical model that can be used to simulate the sedimentation process under two scenarios: first, the flocculation unit is on duty, and second, the flocculation unit is out of commission. The general equation of flow and sediment transport were solved using the finite difference method, then coded using Matlab software. The result of this study was: the difference in removal efficiency between the coded model and operational model for each particle size dataset was very close, with a difference value of +3.01%, indicating that the model can be used to predict the removal efficiency of a rectangular sedimentation basin. The study also revealed that the critical particle size was 0.01 mm, which means that most particles with diameters larger than 0.01 mm settled due to physical force, while most particles with diameters smaller than 0.01 mm settled due to flocculation process. At 10 m from the inlet zone, the removal efficiency was more than 60% of the total removal rate, indicating that increasing basin length is not a cost-effective way to improve removal efficiency. The influence of the flocculation process appears at particle sizes smaller than 0.01 mm, which is a small percentage (10%) of sieve analysis test. When the percentage reaches 20%, the difference in accumulative removal efficiency rises from +3.57% to 11.1% at the AL-Muthana sedimentation unit.
Abstract To ensure that the distribution system has safe drinking water. It is necessary to know the residual chlorine concentrations at various points in the network. A chlorine photometer device was used to measure twenty points taken every day for a week at a selected time in the distribution system. Both pressures and flows in the network were measured using bourdon gauge and Tuf-2000H Handheld Digital ultrasonic flow meters. WaterGEMS CONNECT Edition update one software was used to simulate the flow in the network. The Baghdad water department provided the data about the network, such as the lengths of pipes, the layout of the network, and pipes diameters. The network calibrated consists of 781 pipes of different lengths and 542 juncti
... Show MoreThe statistical distributions study aimed to obtain on best descriptions of variable sets phenomena, which each of them got one behavior of that distributions . The estimation operations study for that distributions considered of important things which could n't canceled in variable behavior study, as result this research came as trial for reaching to best method for information distribution estimation which is generalized linear failure rate distribution, throughout studying the theoretical sides by depending on statistical posteriori methods like greatest ability, minimum squares method and Mixing method (suggested method).
The research
... Show MoreOften phenomena suffer from disturbances in their data as well as the difficulty of formulation, especially with a lack of clarity in the response, or the large number of essential differences plaguing the experimental units that have been taking this data from them. Thus emerged the need to include an estimation method implicit rating of these experimental units using the method of discrimination or create blocks for each item of these experimental units in the hope of controlling their responses and make it more homogeneous. Because of the development in the field of computers and taking the principle of the integration of sciences it has been found that modern algorithms used in the field of Computer Science genetic algorithm or ant colo
... Show MoreThe current study was conducted to find out the effect of the sediment source (sedimentary of Iraqi-Iranian borderline and Tigris River) on the content and distribution of feldspar minerals and their effect on the optical properties of these minerals in some soils of Wasit and Maysan province. Eight pedons were chosen to represent the study area, five of them represented sediments coming from the borderline, which included pedons of (Badra, Taj Al-Din, Al-Shihabi, Jassan, and Galat), while two of them represent the sediments of the Tigris River (Essaouira, Al-Dabouni). Finally, the pedon of Ali Al-Gharbi represented the mixing area of sediments of all the torrents coming from borderline and the sediments of the Tigris River. The diagnostic
... Show MoreIn this paper, the Monte-Carlo simulation method was used to compare the robust circular S estimator with the circular Least squares method in the case of no outlier data and in the case of the presence of an outlier in the data through two trends, the first is contaminant with high inflection points that represents contaminant in the circular independent variable, and the second the contaminant in the vertical variable that represents the circular dependent variable using three comparison criteria, the median standard error (Median SE), the median of the mean squares of error (Median MSE), and the median of the mean cosines of the circular residuals (Median A(k)). It was concluded that the method of least squares is better than the
... Show MoreThis paper introduces a Certain Subclass of Meromorphic Univalent Positives Coefficients Defined by the q-Difference Operator. Coefficient estimates are investigated and obtained, and the upped bound is calculated.
Foundations supporting reciprocating engines, radar towers, turbines, large electric motors, and generators, etc. are subject to vibrations caused by unbalanced machine forces as well as the static weight of the machine. If these vibrations are excessive, they may damage the machine or cause it not to function properly. In the case of block foundation, if changes in size and mass of the foundation do not lead to a satisfactory design, a pile foundation may be used. In this study, the dynamic response of piles and pile Groups in dry sand is investigated experimentally. The analysis involves the displacement response under harmonic excitation. In addition, a numerical modeling by using finite element method with a three-dimensional formula
... Show MoreFloods caused by dam failures can cause huge losses of life and property, especially in estuarine areas and valleys. In spite of all the capabilities and great improvements reached by man in the construction of dams and their structures, they will remain helpless before the powerful forces of nature, especially those related to tectonic activation, and the occurrence of earthquakes of different intensities.
The region extending from the Ilisu Dam in Turkey to the Mosul Dam in Iraq was chosen as an area for this study, and the HEC-RAS application was used to simulate the collapse of the Ilisu Dam due to a major earthquake, to know the magnitude of the risks and losses that could result
Dam break is series phenomenon that can result in fatal consequences and loss of properties. Unfortunately, the observed consequences can only be available after the dam breaks. Therefore, it is important to anticipate what will happen prior to dam break to issue suitable warning and locate the possible risk areas. This study attempts to simulate the case of dam break in Blue Nile at Roseires dam and see its consequences downstream. Roseires dam lies at a distance of 630 km south of Khartoum, Sennar dam lies at about 260 km downstream of Roseires dam. In this study hydraulic model is developed based of Hydraulic Engineering Centre (HEC), River Analysis System (RAS), and HEC- RAS. The HEC-RAS based model is calibrated and validated usi
... Show More