<span>Digital audio is required to transmit large sizes of audio information through the most common communication systems; in turn this leads to more challenges in both storage and archieving. In this paper, an efficient audio compressive scheme is proposed, it depends on combined transform coding scheme; it is consist of i) bi-orthogonal (tab 9/7) wavelet transform to decompose the audio signal into low & multi high sub-bands, ii) then the produced sub-bands passed through DCT to de-correlate the signal, iii) the product of the combined transform stage is passed through progressive hierarchical quantization, then traditional run-length encoding (RLE), iv) and finally LZW coding to generate the output mate bitstream.
... Show MoreA new algorithm is proposed to compress speech signals using wavelet transform and linear predictive coding. Signal compression based on the concept of selecting a small number of approximation coefficients after they are compressed by the wavelet decomposition (Haar and db4) at a suitable chosen level and ignored details coefficients, and then approximation coefficients are windowed by a rectangular window and fed to the linear predictor. Levinson Durbin algorithm is used to compute LP coefficients, reflection coefficients and predictor error. The compress files contain LP coefficients and previous sample. These files are very small in size compared to the size of the original signals. Compression ratio is calculated from the size of th
... Show MoreThe aim of this research is to compare traditional and modern methods to obtain the optimal solution using dynamic programming and intelligent algorithms to solve the problems of project management.
It shows the possible ways in which these problems can be addressed, drawing on a schedule of interrelated and sequential activities And clarifies the relationships between the activities to determine the beginning and end of each activity and determine the duration and cost of the total project and estimate the times used by each activity and determine the objectives sought by the project through planning, implementation and monitoring to maintain the budget assessed
... Show MoreThis work deals with the separation of benzene and toluene from a BTX fraction. The separation was carried out using adsorption by molecular sieve zeolite 13X in a fixed bed. The concentration of benzene and toluene in the influent streams was measured using gas chromatography. The effect of flow rate in the range 0.77 – 2.0 cm3/min on the benzene and toluene extraction from BTX fraction was studied. The flow rate increasing decreases the breakthrough and saturation times. The effect of bed height in the range 31.6 – 63.3 cm on benzene and toluene adsorption from BTX fraction was studied. The increase of bed height increasing increases the break point values. The effect of the concentration of benzene in the range 0.0559 – 0.2625g/
... Show MoreThis research supports the UN’s 2030 Agenda and its goals of ending poverty and hunger. Fruit and vegetable (FandV) lose their freshness and weight when stored at unsuitable temperatures and relative humidity. This study was conducted in Baghdad governorate, located at latitude 33.3128057 and longitude 44.3614875, in the Karrada region from February 27 to April 17, 2024. It compared the effectiveness of different storage technologies, including evaporative cooling, various air velocities, and diverse packaging methods, against sustainable and nonpackaging approaches. The study employed an air cooler with a volume of 2000 ft3/s and insulated packaging. Temperature and relative humidity were recorded in the storage environment
... Show MoreCost estimation is considered one of the important tasks in the construction projects management. The precise estimation of the construction cost affect on the success and quality of a construction project. Elemental estimation is considered a very important stage to the project team because it represents one of the key project elements. It helps in formulating the basis to strategies and execution plans for construction and engineering. Elemental estimation, which in the early stage, estimates the construction costs depending on . minimum details of the project so that it gives an indication for the initial design stage of a project. This paper studies the factors that affect the elemental cost estimation as well as the rela
... Show MoreThis research aim at finding out the impact of using the strategy of shape V on the achievement of the students of the Department of Artistic Education in the subject of "Principles of scientific Research ". This strategy is one of the cognitive strategies used in this topic . To verify the aim of the research ,the two researchers have put the following null hypothesis:-There are no significant differences on the level of 0,05 among the average degrees of the students of the experimental group in their answers on the topics of the pre and post cognitive achievement tests of the subject of "principles of scientific Research " . The two researchers have adopted the experimental approach which consists of one group . the population of the r
... Show More