This research represents a practical attempt applied to calibrate and verify a hydraulic model for the Blue Nile River. The calibration procedures are performed using the observed data for a previous period and comparing them with the calibration results while verification requirements are achieved with the application of the observed data for another future period and comparing them with the verification results. The study objective covered a relationship of the river terrain with the distance between the assumed points of the dam failures along the river length. The computed model values and the observed data should conform to the theoretical analysis and the overall verification performance of the model by comparing it with another set of data. The model was calibrated using data from gauging stations (Khartoum, Wad Medani, downstream Sennar, and downstream Roseires) during the period from the 1st of May to 31 of October 1988 and the verification was done using the data of the same gauging stations for years 2003 and 2010 for the same period. The required available data from these stations were collected, processed and used in the model calibration. The geometry input files for the HEC-RAS models were created using a combination of ArcGIS and HEC-GeoRAS. The results revealed high correlation (R2 ˃ 0.9) between the observed and calibrated water levels in all gauging stations during 1988 and also high correlation between the observed and verification water levels was obtained in years 2003 and 2010. Verification results with the equation and degree of correlation can be used to predict future data of any expected data for the same stations.
This study examines the vibrations produced by hydropower operations to improve embankment dam safety. This study consists of two parts: In the first part, ANSYS-CFX was used to generate a three-dimensional (3-D) finite volume (FV) model to simulate a vertical Francis turbine unit in the Mosul hydropower plant. The pressure pattern result of the turbine model was transformed into the dam body to show how the turbine unit's operation affects the dam's stability. The upstream reservoir conditions, various flow rates, and fully open inlet gates were considered. In the second part of this study, a 3-D FE Mosul dam model was simulated using an ANSYS program. The operational turbine model's water pressure pattern is conveyed t
... Show MoreThe high and low water levels in Tigris River threaten the banks of the river. The study area is located on the main stream of Tigris River at Nu’maniyah City and the length of the considered reach is 5.4 km, especially the region from 400 m upstream Nu’maniyah Bridge and downstream of the bridge up to 1250 mwhich increased the risk ofthe problemthat itheading towardsthe streetand causingdanger tonearbyareas.
The aim of this research is to identify the reason of slope collapse and find proper treatments for erosion problem in the river banks with the least cost. The modeling approach consisted of several steps, the first of which is by using “mini” JET (Jet Erosion Test) d
... Show MoreIn this study water quality was indicated in terms of Water Quality Index that was determined through summarizing multiple parameters of water test results. This index offers a useful representation of the overall quality of water for public or any intended use as well as indicating pollution, water quality management and decision making. The application of Water Quality Index (WQI) with sixteen physicochemical water quality parameters was performed to evaluate the quality of Tigris River water for drinking usage. This was done by subjecting the water samples collected from eight stations in Baghdad city during the period 2004-2010 to comprehensive physicochemical analysis. The sixteen physicochemical parameters included: Turbidity,
... Show MoreIn this study water quality was indicated in terms of Water Quality Index that was determined through summarizing multiple parameters of water test results. This index offers a useful representation of the overall quality of water for public or any intended use as well as indicating pollution, water quality management and decision making. The application of Water Quality Index
(WQI) with sixteen physicochemical water quality parameters was performed to evaluate the quality of Tigris River water for drinking usage. This was done by subjecting the water samples collected from eight stations in Baghdad city during the period 2004-2010 to comprehensive physicochemical analysis. The sixteen physicochemical parameters included: Turbidity, A
F0od and feeding habits of Hetropnezt.s!fes ]ossili/}:. (Bloch) have been investigated. Monthly samples (twice a m()nth} were taken during the period from March 2000 to February 20.Ql , using small -
meshed cast net. A total of l9J ftsh were used to examine the stomach
contents.
The analysis of stomach contents of H fo.s-silis in the- area of study revealed that fish were fed on the bottom, mid ·surface and surface &
... Show MoreThe measurement data of the raw water quality of Tigris River were statistically analyzed to measure the salinity value in relation to the selected raw water quality parameters. The analyzed data were collected from five water treatment plants (WTPs) assembled alongside of the Tigris River in Baghdad: Al-Karkh, Al-Karama, Al-Qadisiya, Al-Dora, and Al-Wihda for the period from 2015 to 2021. The selected parameters are total dissolved solid (TDS), electrical conductivity (EC), pH and temperature. The main objective of this research is to predicate a mathematical model using SPSS software to calculate the value of salinity along the river, in addition, the effect of electrical conductivi
The reduction in the rivers capacity is one the most important issue to give the decision maker an idea during the flood season. The study area included the rivers of the Al Atshan, Al Sabeel and Euphrates, which are surveyed with a length of 21, 5 and 20 km respectively. The Euphrates , the Atshan and Al Sabeel rivers were simulated by using HEC-RAS 5.0.3 software to study the real condition within the city of Assamawa. As well as the simulation was implemented by modifying the cross sections of the Euphrates and Al Sabeel rivers to increase their capacity to 1300 and 1200 m3/s respectively which are a flood discharges100 year return periods. The results showed that the maximum discharge capacity under real conditions o
... Show MoreVaried uses of international rivers in the past few decades dramatically, resulting in this multiplicity of uses and all associated with it for the occurrence of freshwater scarcity activities, and thus an increase in conflicts and disputes around on the rights of each of the riparian countries to benefit from the waters of the river at various purposes, particularly the establishment of dams on some of them as is the case (Renaissance Ethiopian) big impact on downstream countries Dam (Egypt and Sudan), due to the Oukuahma at the end of the Nile Valley made them vulnerable to environmental fluctuations, political crises facing the Nile basin countries, and any reduction in the proportion of water is not only the Nile River, but for all r
... Show MoreThe main source of water supply in Iraq is the surface water, especially Tigris and Euphrates Rivers and their tributaries. In the recent years there was a great drop in the water levels of Tigris River within Baghdad City which had affected the operation of twelve water supply projects located on the banks of Tigris River in Baghdad City, due to significant climate changes, and the expansion of hydraulic construction (dams) and implementation of new irrigation projects in Turkey, these factors have greatly reduced the water flowrates of river by about 46%. In the present study the flow characteristics of Tigris River within Baghdad City was studied, the reach involved was about 49km in which it represents the urban zone
... Show More