Preferred Language
Articles
/
joe-699
Calculation of Pressure Loss of Two Drilling Muds in Noor Oil Field
...Show More Authors

   

In this work, calculation of pressure losses in circulating system for two drilling muds is evaluated in Noor oil field. Two types of drilling muds that were used for drilling section 12 1/4" and 8 3/4" which are Salt saturated mud and Ferro Chrome Lignosulfonate-Chrome Lignite mud. These calculations are based on field data that were gathered from the drilling site of well Noor-15, which are included, rheological data, flow data and specification of drill string. Based on the obtained results, the best rheological model that fit their data is the Herschel-Bulkley model according to correlation coefficient value for their two drilling mud. Also, the difference between the calculated pressure loss by Herschel-Bulkley model and standpipe pressure value are very convergence.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun Sep 30 2001
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Contamination of Drilling Muds in Southern Iraqi Fields
...Show More Authors

View Publication Preview PDF
Publication Date
Thu Jun 29 2023
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Drilling Optimization by Using Advanced Drilling Techniques in Buzurgan Oil Field
...Show More Authors

Efficient and cost-effective drilling of directional wells necessitates the implementation of best drilling practices and advanced techniques to optimize drilling operations. Failure to adequately consider drilling risks can result in inefficient drilling operations and non-productive time (NPT). Although advanced drilling techniques may be expensive, they offer promising technical solutions for mitigating drilling risks. This paper aims to demonstrate the effectiveness of advanced drilling techniques in mitigating risks and improving drilling operations when compared to conventional drilling techniques. Specifically, the advanced drilling techniques employed in Buzurgan Oil Field, including vertical drilling with mud motor, managed pres

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Tue Jun 30 2015
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Using the Artificial Gas Lift to Increase the Productivity of Noor Oil Field / Mishrif Formation
...Show More Authors

Noor Oil Field is one of Iraqi oil fields located in Missan province / Amarah city. This field is not subjected to licensing rounds, but depends on the national effort of  Missan Oil Company. The first two wells in the field were drilled in seventies and were  not opened to production until 2009. The aim of this study is to study the possibility of using the method of gas lift to increase the productivity of this field . PROSPER software was used to design the continuous  gas lift by using maximum production rate in the design.

   The design was made after comparing  the measured pressure with the calculated pressure, this comparison  show  that the method of Beggs-Brill and Petroleum Exper

... Show More
View Publication Preview PDF
Publication Date
Thu Jun 30 2016
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Study the Efficiency of Drilling With Casing Operation in an Iraqi Oil Field
...Show More Authors

Drilling with casing (DWC) can be considered as a modern drilling technique in which both of drilling and casing operations done in the same time by using the casing to transfer the hydraulic and mechanical power to the bit instead of traditional drilling string. To overcome oil well control, minimizing the total cost through enhancing drilling efficiency, drilling with casing was proposed as an enabling technology.

   Two surface sections (17 1/2 - and 12 1/4- inch) were drilled successfully in Rumaila oil field with  casing strings which reached 655m and 1524m measured depths respectively.

   By using DWC technique, the total drill/case phase time was reduced up to 20% comparing to conventional

... Show More
View Publication Preview PDF
Publication Date
Sun Jun 27 2010
Journal Name
All Days
Optimal Field Development Through Infill Drilling for the Main Pay in South Rumaila Oil Field
...Show More Authors
Abstract<p>Study of determining the optimal future field development has been done in a sector of South Rumaila oil field/ main pay. The aspects of net present value (economic evaluation) as objective function have been adopted in the present study.</p><p>Many different future prediction cases have been studied to determine the optimal production future scenario. The first future scenario was without water injection and the second and third with 7500 surface bbls/day and 15000 surface bbls/day water injection per well, respectively. At the beginning, the runs have been made to 2028 years, the results showed that the optimal future scenario is continuing without water in</p> ... Show More
View Publication
Scopus (13)
Crossref (3)
Scopus Crossref
Publication Date
Tue Jul 01 1997
Journal Name
Polymer-plastics Technology And Engineering
Reverse Calculation of Pressure from Pseudopressure
...Show More Authors

View Publication
Scopus Clarivate Crossref
Publication Date
Fri Oct 07 2022
Journal Name
Texas Journal Of Engineering And Technology
Estimation of Pore Pressure and In-Situ Stresses for Halfaya Oil Field: A Case Study
...Show More Authors

Preview PDF
Publication Date
Thu Dec 15 2022
Journal Name
Journal Of Petroleum Research And Studies
Selection of an Optimum Drilling Fluid Model to Enhance Mud Hydraulic System Using Neural Networks in Iraqi Oil Field
...Show More Authors

In drilling processes, the rheological properties pointed to the nature of the run-off and the composition of the drilling mud. Drilling mud performance can be assessed for solving the problems of the hole cleaning, fluid management, and hydraulics controls. The rheology factors are typically termed through the following parameters: Yield Point (Yp) and Plastic Viscosity (μp). The relation of (YP/ μp) is used for measuring of levelling for flow. High YP/ μp percentages are responsible for well cuttings transportation through laminar flow. The adequate values of (YP/ μp) are between 0 to 1 for the rheological models which used in drilling. This is what appeared in most of the models that were used in this study. The pressure loss

... Show More
View Publication
Crossref
Publication Date
Sun Dec 30 2012
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Hydrodynamic Pressure Gradient Correlation of Some Iraqi Oil Wells
...Show More Authors

Empirical equation has been presented to predict the optimum hydrodynamic
pressure gradient with optimum mud flow rate (one equation) of five Iraqi oil wells
to obtain the optimum carrying capacity of the drilling fluid ( optimum transport
cuttings from the hole to the surface through the annulus).
This equation is a function of mud flow rate, mud density and penetration
rate without using any charts or graphs.
The correlation coefficient accuracy is more than 0.9999.

View Publication Preview PDF
Publication Date
Sat Mar 30 2024
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Optimization of Separator Size and Operating Pressure for Three-phase Separators in the West Qurna1 Oil Field
...Show More Authors

An optimization study was conducted to determine the optimal operating pressure for the oil and gas separation vessels in the West Qurna 1 oil field. The ASPEN HYSYS software was employed as an effective tool to analyze the optimal pressure for the second and third-stage separators while maintaining a constant operating pressure for the first stage. The analysis involved 10 cases for each separation stage, revealing that the operating pressure of 3.0 Kg/cm2 and 0.7 Kg/cm2 for the second and third stages, respectively, yielded the optimum oil recovery to the flow tank. These pressure set points were selected based on serval factors including API gravity, oil formation volume factor, and gas-oil ratio from the flow tank.    To impro

... Show More
Preview PDF
Crossref