Preferred Language
Articles
/
jih-686
The Construction and Reverse Construction of the Complete Arcs in the Projective 3-Space Over Galois Field GF(2)
...Show More Authors

  The main purpose of this work is to find the complete arcs in the projective 3-space over Galois field GF(2), which is denoted by PG(3,2), by two methods and then we compare between the two methods

View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun Mar 02 2008
Journal Name
Baghdad Science Journal
Design and construction of Video extractor
...Show More Authors

Design and construction of video extractor circuit require an understanding of several parameters, which include: Selector circuit, extracting circuit which contains sampling signal and multiplexing. At each radar pulse, the video signal is fed to one of the selector. The fast filter has a pass –band from 190 Hz to 1800 Hz. These frequencies correspond to targets having radial velocities laying between and 10 Kph and 200 Kph.Slow filter: 60 Hz to 230 Hz for radial velocities laying between 3.5 and 13 Kph.The video- extractor is organized in four PCB CG (A-B-C-D) each one having 16 selector. The sampling signal (ADS) (1-2-3-4) control the 4-line-to-16-line decoders. 8 multiplexers of 8 inputs each, are required for the multiplexing of the

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Apr 30 2017
Journal Name
Journal Of Engineering
Effect of Construction Joints on the Behavior of Reinforced Concrete Beams
...Show More Authors

In this study, the effect of construction joints on the performance of reinforced concrete beams was experimentally investigated. Seven beam specimens, with dimensions of 200×100×1000 mm, were fabricated. The variables were considered including; the location and configuration of the joints. One beam was cast without a joint (Reference specimen), two specimens were fabricated with a one horizontal joint located either at tension, or compression zone. The fourth
beam had two horizontal joints placed at tension, and compression area. The remaining specimens were with one or two inclined joints positioned at the shear span or beam’s mid-span. The specimens were subjected to a monotonic central concentrated loading until the failure. T

... Show More
View Publication Preview PDF
Publication Date
Wed Feb 01 2023
Journal Name
Practice Periodical On Structural Design And Construction
Leading Indicators of the Health and Well-Being of the Construction Workforce: Perception of Industry Professionals
...Show More Authors

View Publication
Scopus (7)
Crossref (5)
Scopus Clarivate Crossref
Publication Date
Thu Feb 01 2024
Journal Name
Journal Of Engineering
Improving Building Information Modeling (BIM) Implementation throughout the Construction Industry
...Show More Authors

Building Information Modeling (BIM) is extensively used in the construction industry due to its benefits throughout the Project Life Cycle (PLC). BIM can simulate buildings throughout PLC, detect and resolve problems, and improve building visualization that contributes to the representation of actual project details in the construction stage. BIM contributes to project management promotion by detecting problems that lead to conflicts, cost overruns, and time delays. This work aims to implement an effective BIM for the Iraqi construction projects’ life cycle. The methodology used is a literature review to collect the most important factors contributing to the success of BIM implementation, interview the team of the Cent

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Jul 01 2017
Journal Name
Journal Of Construction Engineering And Management
Identification, Quantification, and Classification of Potential Safety Risk for Sustainable Construction in the United States
...Show More Authors

View Publication
Scopus (49)
Crossref (37)
Scopus Clarivate Crossref
Publication Date
Fri Jan 01 2021
Journal Name
E3s Web Of Conferences
Investigation the Opportunity of BIM with Agile Management Approach in Iraqi Construction Projects
...Show More Authors

The construction industry in Iraq suffers from many problems, perhaps the most important of which is the delay in time and the increase in costs. Therefore, it was necessary to try to adopt a new methodology that would help in overcoming these problems. It was suggested to combine building information modeling with the agile management approach because this technique and methodology is modern and helps in reducing time and cost and improving quality. This paper aims to know the status of using Building Information Modeling (BIM) and Agile Project management (APM) in Iraq and to shed light on the merging of this integration, explaining the benefits, difficulties, and workflow practices, finding the most influencing factors on the tim

... Show More
View Publication
Crossref (4)
Crossref
Publication Date
Wed Aug 02 2017
Journal Name
International Journal Of Materials Chemistry And Physics
Assessing the Sustainability of Asphalt Stabilized Subgrade Soil for Embankment Construction
...Show More Authors

Gypseous soil is considered as a problematic soil for embankment construction, however, implementation of emulsified asphalt as a stabilization agent could be a proper solution for enhancing its properties as a subgrade soil. In this work, the sustainability of asphalt stabilized soil has been assessed in terms of its resistance to cyclic (freezing-thawing) and (heating-cooling) processes. Specimens have been prepared at optimum fluid content (moisture and emulsion) and tested under direct shear stresses while subjected to 30 cycles of (freezing-thawing) and (heating-cooling). Both of dry and soaked testing conditions have been implemented. Data have been observed after each 10 cycles, and compared with that of reference mix. It was conclud

... Show More
Publication Date
Tue Dec 22 2020
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Cost Management of construction industries according to the fast-track method
...Show More Authors

Construction projects have become a changing dramatically in recent decades and that the goal of the beneficiaries of the implementation of structural project is to complete the work with less time and within the cost of the specific and the best possible quality may sometimes happen that highlights the importance of time on the rest of the items at the implementation of projects for various reasons, including the need to use the project as soon as possible possible change rapidly to customer's requests, but the high cost of the project represents the biggest obstacle for entrepreneurs with its effects on the quality and the time workers, and is a measure of those elements in monetary terms is the key to integration between them, so the

... Show More
View Publication Preview PDF
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
Identifying the selection criteria of design consultant for Iraqi construction projects
...Show More Authors
Abstract<p>The quality and cost of constructed buildings are heavily influenced by the performance of design/auditing consultants. Thus, selecting the right design consultant and design auditing consultants is of utmost importance and not an easy task for any construction client. so, the client should specify the efficiency criteria and assess the performance levels of the design and design auditing consultant firm. The study aims to identify the selection criteria of the design consultant in construction projects and also identify the selection criteria of the design auditing consultant for the construction projects by using the Delphi survey with applying the principal components analysis (PCA</p> ... Show More
View Publication
Scopus (1)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Fri Mar 01 2013
Journal Name
Journal Of Economics And Administrative Sciences
The construction of Investment Portfolios in the Iraq Stock Exchange: Market Timing Vs. an Efficient Selection
...Show More Authors

Abstract

         Uncertainty, the deeply-rooted fact that surrounding the investment environment, especially the stock market which just prices have taken a specific trend until they moved to another one for its up or down. This means that the volatility characteristic of financial market requires the rational investor an argument led towards the adoption of planned acts to gain greater benefit in the goal of wealth maximizing. There is no possibility to achieve this goal without the burden of uncertainty and the risk of systematic fluctuations of investment returns in the financial market after the facts of  efficient diversification have pro

... Show More
View Publication Preview PDF
Crossref