Wind energy is becoming one of the renewable energy that has attracted great attention all over the world. This research work aims to build a map by which the user can have a thought about the number of generation hours of electricity from wind through all the year at the location of study (Wasit-Iraq). To interact the idea, this study included using the work included using different wind turbines at different heights. The results show that Gamesa G58-850 KW wind turbine gives more generated hours at 50 meters height.
The main objective of the paper is to study the possibility of erecting 2 MW wind turbine in the south of Iraq (Barjisiah site) by utilizing WAsP model. Wind potential and output predicted the power of WT at a supposed site was calculated. The results for proposed WT showed the WT has a weak performance due to its high capacity and low potential of wind speeds at this site. So, the WT will provide power for a limited time during the year due to its operating at the zone under the rated wind speed.
Matching between wind site characteristics and wind turbine characteristics for three selected sites in Iraq was carried out. Site-turbine matching for potential wind power application in Iraq has not yet been well reported on. Thus, in this study, five years’ wind speed data for sites located in Baghdad (33.34N, 44.40E), Nasiriyah (31.05N, 46.25E), and Basrah (30.50N, 47.78E) were collected. A full wind energy analysis based on the measured data, Weibull distribution function, and wind turbine characteristics was made. A code developed using MATLAB software was used to analyse the wind energy and wind turbines models. The primary objective was to achieve a standard wind turbine-site matching based on the capacity factor. Another matching
... Show MoreWind farm assessment project have several steps. This paper aim on the second step which is harvesting the roads properties from the loading point to the construction point. The difficulties of examining the roads whether they are appropriate or not for transporting wind turbine components. The selected site for establishing wind farm is located at Maysan province and has 262 km distance from Um – Qaser port. The results through applying remote sensing and GIS techniques on Landsat (30 m resolution) and QuckBird (0.6 m resolution) are summarized by (2 hard turn, 18 Bridges that crossing over, and 13 Bridges passing under).
The aim of most researchers is to complete full projects for establishing renewable sources stations. The project depend on many variables, which is called criteria, that’s makes the project workable or not. The criterion which studied in this paper is roads suitability for transporting turbines from the loading ports to construction site. One of the important factors which must provide paved roads for transportation and within standard. Southern Um-Qasr port is the best choice to receive wind turbine equipments. The nods down to the construction region will face 0 turns, 2 bridges that crosses over and 23 bridges that passes underneath.
One of the most demanded studies is wind turbine site assessment. It is difficult to build a simulation program because of the many variables that affect the wind speed and direction. The procedure of this research depend on two approaches, the Wind Atlas Analysis model and the Inverse Distance Wait interpolation. These procedures give the estimated annual energy production for each turbine (V82) with 82m blades diameter at 70m hub heights. The output at this location for each turbine is about (4.3 GWh). The studied area is about 20x20km2 and could be plant at least 600 turbine and have about 2500 GWh of annual energy production.
The world's renewable energy sources have taken on great importance, for its cleanness and its environmental effects as well as being a renewable source, Increased demand for fossil energy sources is also causing global warming and climate change. Iraq is an appropriate area for renewable energy This study shows that renewable alternative energy has not been used sufficiently enough at present. But this energy can play an important role in the future of renewable energy in Iraq. This research aims to study the renewable energy in Iraq (solar energy) and it is appropriate to develop this alternative energy for crude oil, which is characterized by the use of the most appropriate and less economical and more environmentally friendly. Solar
... Show Moreدُرِست العوامل المؤثرة في عدد ساعات تجهيز الكهرباء في مدينة بغداد، وتكونت عينة الدراسة من (365) مشاهدة يومية لعام 2018، وتمثلت بستة متغيرات استعملت في الدراسة. كان الهدف الرئيس هو دراسة العلاقة بين هذه المتغيرات، وتقدير تأثيرات المتغيرات التنبؤية في المتغير التابع (عدد ساعات تجهيز الكهرباء في مدينة بغداد). ولتحقيق ذلك استعملت نمذجة المعادلات الهيكلية/ تحليل المسار وبرنامج AMOS
... Show MoreAssessment of annual wind energy potential for three selected sites in Iraq has been analyzed in the present work. The wind velocities data from August 2014 to July 2015 were collected from the website of Weather Underground Organization (WUO) at stations elevation (35m, 32m, and 17m) for Baghdad, Najaf, and Kut Al-Hai respectively. Extrapolation of stations elevation and wind velocities was used to estimate wind velocities at (60m, 90m, and 120m). The objectives are to analyze the wind speed data and assess the wind energy potential for wind energy applications. Computer code for MATLAB software has been developed to solve the mathematical model. The results are presented as a monthly and annual average for wind velocities, standard deviat
... Show MoreIn this paper, the 5 minutes measured wind speed data for year 2012 at 10 meter height for Tweitha have been statically analyzed to assess the time of wind turbine electrical power generation. After collection Tweitha wind data and calculation of mean wind speed the cumulative Weibull diagram and probability density function was ploted, then each of cumulative Weibull distribution, cut-in and furling turbine wind speed could be used as a mathematical input parameters in order to estimate the hours of electrical power generation for wind turbine during one day or one year. In Tweitha site, found that the average wind speed was (v= 1.76 m/s), so five different wind turbines were be selected to calculate hours of electrical generation for A
... Show MoreThis study focuses on the basics of cultivation and production of the Wheat Crop in
Wasit Province ; in order to reveal the reality of the geographical distribution of its cultivation
and production.
Wheat is the most important field crops cultivated in Wasit province, as it has vast
possibilities for expansion in growing and production, in which agriculture conducted in a
year and left in other , then changing this method would increase cultivated area of it to nearly
doubled, as well as the possibility of increasing average yields in Donam by using improved
seeds, fertilizer, with the availability of water lever machines, especially wheat is grown in
areas of rivers abutment.
The study showed the spread of th