A field experiment was carried out in one of the orchards of Al-Qassim district in Babel Governorate to find out the ability of a locally manufactured platform to serve palm trees by working in flat and uneven orchard land, palm tree heights of 4, 8, and 12 meters, and it performs pollination, pruning and harvesting services. The time of ascent and descent, the palm service, and the palm/hour productivity were measured. A randomized complete block design with three replications used a split split-plot arrangement. The nature of the land (flat or uneven) represented the main plots, the height of the palm trees (4, 8, 12) meters, the sub-plots, and the palm service operations (pollination, pruning, harvesting) of the sub-sub plots. The data were analyzed and compared according to the L.S.D test at the probability level of 0.05. The results indicated that there is a significant effect of the palm height factor and the type of service factor on the studied characteristics. The highest time for ascent and descent was 101.22 and 50.86 seconds, respectively, at the height of 12 meters, and the highest time for serving the palm tree was 95.40 seconds/palm for the pruning process, and the least productivity was 7.33 palm trees/hour for the pruning process. There was a significant interaction between the palm tree’s height and the land’s nature regarding productivity characteristics. There was a significant difference between the height of the palm tree and the type of service with both times of ascent, descent, and service of a palm tree. Based on the previous, it is possible to use the locally manufactured platform in palm groves to reduce the suffering of palm farmers from the difficulty of performing the necessary operations to serve palm trees, especially those of high altitudes.
A hydraulic platform was manufactured to serve palm trees and to enhance palm tree services, with a height of 12 meters, by the General Company for Hydraulic Industries, one of the Ministry of Industry's formations. This platform was tested in the field after being manufactured according to a randomized complete block design using split-split plots with three factors. The first factor represented the shape of the orchard land, with two levels (flat land and uneven land), serving as the main plots. The second factor had three levels representing palm tree heights (4, 8, and 12 meters), which served as the sub-plots. The third factor was the palm tree services, represented at three levels (pruning, pollination, and harvesting), with each trea
... Show MoreTraditional tree management is laborious and costly, thus this work aimed to study the performance of two different types of frond cutting saws (reciprocating saw and vibrating saw) and examine the two saws on five date palm varieties. Four parameters were examined, including cutting time for a single frond, the power needed for cutting a single frond, frond cutting productivity expressed as tree/h, and vibration conveyed to the worker’s hand. A field experiment was designed according to the nested randomized complete block design, including five date palm varieties as the main plot and the type of saw as a sub-plot. Means were compared using the least significant differences (LSD 0
Photovoltaic (PV) devices are widely used renewable energy resources and have been increasingly manufactured by many firms and trademarks. This condition makes the selection of right product difficult and requires the development of a fast, accurate and easy setup that can be implemented to test available samples and select the cost effective, efficient, and reliable product for implementation. An automated test setup for PV panels using LabVIEW and several microcontroller-based embedded systems were designed, tested, and implemented. This PV testing system was fully automated, where the only human intervention required was the instalment of PV panel and set up of required testing conditions. The designed and implemented system was
... Show MoreOne of the main element in the network is the intersection which consider as the critical points because there are many conflict in this element. The capability and quality of operation of an intersection was assessed to provide a better understanding of the network's traffic efficiency. In Baghdad city, the capital of/Iraq the majority of the intersections are operated under the congestion status and with level of service F, therefore theses intersection are consider as high spot point of delay in the network of Baghdad city. In this study we selected Al-Ameria signalized intersection as a case study to represent the delay problem in the intersections in Baghdad. The intersection is located in the w
In the last years, the self-balancing platform has become one of the most common candidates to use in many applications such as flight, biomedical fields, industry. This paper introduced the simulated model of a proposed self-balancing platform that described the self–balancing attitude in (X-axis, Y-axis, or both axis) under the influence of road disturbance. To simulate the self-balanced platform's performance during the tilt, an integration between Solidworks, Simscape, and Simulink toolboxes in MATLAB was used. The platform's dynamic model was drawn in SolidWorks and exported as a STEP file used in the Simscape Multibody environment. The system is controlled using the proportional-integral-derivative (PID) co
... Show More
In the last years, the self-balancing platform has become one of the most common candidates to use in many applications such as flight, biomedical fields, industry. This paper introduced the simulated model of a proposed self-balancing platform that described the self–balancing attitude in (X-axis, Y-axis, or both axis) under the influence of road disturbance. To simulate the self-balanced platform's performance during the tilt, an integration between Solidworks, Simscape, and Simulink toolboxes in MATLAB was used. The platform's dynamic model was drawn in SolidWorks and exported as a STEP file used in the Simscape Multibody environment. The system is controlled using the proportional-integral-deriva
... Show More